Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T13CM06530
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/20/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
11/25/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
11/29/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Comment not resolved. Provide information on the drawings to coordinate with the component descriptions used in COMcheck (e.g. show the continuous insulation used for the roof and for the floor located over an unconditioned space). Complete the Envelope Compliance Certificate by checking the appropriate line items in Section 3, the Air Leakage, Component Certification, and Vapor Retarder Requirements. [Initial comment: The operations office is heated and cooled with a heat pump; verify that the operations office has been included in the envelope energy calculations. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information on the drawing shall, as a minimum, include the R-values of the insulation. Complete the Envelope Compliance Certificate by checking the appropriate line items in Section 3, the Air Leakage, Component Certification, and Vapor Retarder Requirements. Supporting documentation shall be either on the drawings or in the project manual. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.] |
11/29/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | The proposed temperature mixing valve (Symmons model 7-400A) is listed as being CSA B125.3 compliant but not ASSE 1070 which is specifically required by Section 607.1.1, IPC 2012. [Initial comment: Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Sections 416.5 and 607.1, IPC 2012 and Section C404.3, IECC 2012.] |
12/02/2013 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/04/2013 | CPIERCE1 | REJECT SHELF | Completed |