Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM06395
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/22/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
10/24/2013 | JEFF DRUMM | LANDFILL | REVIEW | Approved | |
10/28/2013 | MICHAEL ST. PAUL | ZONING | REVIEW | Reqs Change | Approval of DP13-0148 required. |
10/28/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
10/28/2013 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
10/30/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
11/15/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Demonstrate energy code compliance for the building envelope using calculations based on the current code. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.3, C101.5, C103.2, and C401.2, IECC 2012. 2. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012. 3. Verify that the HVAC unit controls have been provided with an automatic start capability. Reference: Section C403.2.4.3.3, IECC 2012. 4. Clarify how excess outside air relief from the building is to be accomplished. Reference: Section C403.3.1.1.4, IECC 2012. |
11/15/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the waste and vent riser diagram to coordinate with the plumbing plan. Reference: Section 107.2.1, IBC 2012. 2. The developed length of the hot water supply piping appears to be greater than fifty feet and detail 7/P.0 indicates the presence of a recirculating hot water system; show the return hot water piping on the plumbing plan and the water riser diagram. Reference: Section 607.2, IPC 2012. 3. Show the required flow rate for the hot water recirculating pump. |
11/15/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/18/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/18/2013 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |