Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T13CM06388
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/18/2013 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
10/18/2013 | DAVID RIVERA | ZONING | REVIEW | Approved | |
10/21/2013 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/21/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Show handrails and dimensions in plans for all stairs. 2. The mezzanine is not a mezzanine. Reference 2012 IBC, Section 505 for mezzanine requirements. This is a second floor level. 3. Please provide all code data analysis. 4. Handrail is to be min 1 1/2" from wall not 1 1/4" 5. Detail 5/A4: a. Provide water closet clearance as per ICC ANSI 117.1, Section 604.3 b. Provide vertical grab bar as per ANSI 604.5.1. 6. Lettering size on all drawings is to be an actual (not CAD font size) 3/32" minimum both upper and lower case. Revise all drawings and resubmit. 7. Provide vertical grab bar at detail 7/A4. 8. Detail 5/A4, provide structural bracing to structure above. 9. Provide occupancy load calculation for both levels and total. 10. Provide structural details and calculations for the bracket mounted water heater, including wall analysis. 11. More comments will follow after all the comments above are corrected. END OF REVIEW |
10/21/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
10/21/2013 | KEN BROUILLETTE | FIRE | REVIEW | Denied | NEED OCCUPANCY CLASSIFICATION, OCCUPANT LOAD, TYPE OF CONSTRUCTION AND UPDATE DETAILS TO THE IBC FOR STAIRS |
10/21/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
10/21/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Verify that the replacement glass (sheet A-3) meets the requirements of Section C402.3, IECC 2012. 2. Verify that the proposed programmable thermostat includes an automatic start capability and a set point overlap restriction. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/14/2013 | SHANAE POWELL | OUT TO CUSTOMER | Completed |