Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T13CM06297
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/17/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | See comments for T13CM06288 |
10/18/2013 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved | |
10/22/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
10/22/2013 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: T13CM06297 5300 E Los Reales Road New Tire Wash TRANSMITTAL DATE: October 22, 2013 DUE DATE: October 29, 2013 COMMENTS: 01. Zoning has reviewed the New Tire Wash plans for compliance and consistency with the development package site plan. While the plans are in substantial compliance with the unapproved version of the DP zoning cannot approve the plans until the Revised version of the DP is approved and stamped. 02. Once the DP site has been approved and all building trades reviewers have approved the plan, zoning will approve and sign off on the permit application for the New Tire Wash. 03. Any changes that are made to the DP site plan that affect the proposed New Tire Wash Location must be addressed on both the building plans package and site plan. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
10/23/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
10/23/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide a plumbing design for the installation of the tire wash. Reference: Section 107.2.1, IBC 2012. |
10/23/2013 | ROBERT SHERRY | WATER | REVIEW | Denied | Show the location and size of the water meter and the reduced pressure backflow assembly serving the tire wash. Reference: Section 107.2.1, IBC 2012. |
10/24/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | Reference T13CM06288 Building Comments |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/04/2013 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
11/04/2013 | CPIERCE1 | REJECT SHELF | Completed |