Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T13CM06289
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/17/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | See comments for T13CM06288 |
10/18/2013 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved | |
10/22/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
10/22/2013 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: T13CM06289 5300 e Los Reales Road New Scale House Building TRANSMITTAL DATE: October 22, 2013 DUE DATE: October 29, 2013 COMMENTS: 01. Zoning has reviewed the building plans for compliance and consistency with the development package site plan. While the building plans are in substantial compliance with the unapproved version of the DP zoning cannot approve the building plans until the Revised version of the DP is approved and stamped. 02. Once the DP site has been approved and all building trades reviewers have approved the building plan, zoning will approve and sign off on the permit application for the New Scale House Building. 03. Any changes that are made to the DP site plan that affect the proposed building must be addressed on both the building plans package and site plan. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
10/23/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide the gutter and downspout design for the canopy. Reference: Sections 1106.1 and 1106.6, IPC 2012. |
10/23/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
10/24/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Complete the Envelope Compliance Certificates by checking the appropriate line items in Section 3, the Air Leakage, Component Certification, and Vapor Retarder Requirements. Supporting documentation shall be either on the drawings or in the project manual. 2. Show the R-value for the furring of the exterior walls used in the Envelope Compliance Certificate on the drawings. 3. Provide the calculations and other supporting documentation to justify the U-factor used for the roofs in the Envelope Compliance Certificate. Note that the roofs are exempt from the requirement for having a high albedo coating because the roofs are constantly shaded. |
10/24/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | Reference T12CM06288 Building Comments |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/04/2013 | CPIERCE1 | REJECT SHELF | Completed |