Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T13CM06288
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/17/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM06288 5300 Los Reales Landfill Entrance Facility Electrical plans denied for following, provide a response sheet indicating how each was addressed. 1. Sheet E3.1, The 2 sets of 3 #500 mcm should be 2 sets of 4 #500 mcm from utility transformer to new 800 amp SES, 250.24.C----2011 NEC. 2. Sheet E3.1, the supply conductors from transformer T8 to Panel 8B( 2 sets of 4 3/0 awg, #6) should have the #6 ground sized to a #2 per 250.102.C.2---2011 NEC. 3. Sheet E3.1, the 2 sets of 3 3/0 awg, #6 g --- going to Panel P should include a neutral in each set, Panel P is 4 wire . Also the #6 ground shouls be sized to #4 per 250.102.C.2. 4. Sheet E3.1, feeders from Panel P to Panel 7LA on one line show 2 sets of 4-1/0 awg #6 g, then the Panel schedule for Pnl P on Sheet E5.1 in schedule box shows to be 350 mcm #4 ground ? 5. Sheet E5.1, Panel 7EM draws 146 amps on phase A, the Generator has a 100 amp Main feeding 3/0 feeders to Pnl 7EM ? 6. Provide a calculation showing compliance with 2012 City of Tucson Outdoor Lighting Code. Ray T Majuta Elect Plan Review PDSD, Tucson 10/17/2013 Ray.Majuta@tucsonaz.gov 520-837-4988 |
10/18/2013 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved | |
10/21/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. Please provide certification of special inspectors as required by Sheet S1.3. SHEET 2A2.1 2. Need 18" door jamb clearance at steel access gate as required by 2010 ADASAD, Section 404.2.4.1 SHEET 7A2.1 3. When open, door 107 encroaches into egress corridor by more than 1/2. Reference 2012 IBC, Section 1005.7. SHEET A0.6 4. Please provide additional architectural and structural details and calculations for the wheel wash. END OF REVIEW |
10/22/2013 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: T13CM06288 5300 e Los Reales Road Admin Office Building TRANSMITTAL DATE: October 22, 2013 DUE DATE: October 29, 2013 COMMENTS: 01. Zoning has reviewed the building plans for compliance and consistency with the development package site plan. While the building plans are in substantial compliance with the unapproved version of the DP zoning cannot approve the building plans until the Revised version of the DP is approved and stamped. 02. Once the DP site has been approved and all building trades reviewers have approved the building plan, zoning will approve and sign off on the permit application for the Admin Office Building. 03. Any changes that are made to the DP site plan that affect the proposed building must be addressed on both the building plans package and site plan. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
10/22/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
10/23/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide the size of the gutter. Reference: Section 1106.6, IPC 2012. |
10/23/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
10/24/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Complete the Envelope Compliance Certificate by checking the appropriate line items in Section 3, the Air Leakage, Component Certification, and Vapor Retarder Requirements. Supporting documentation shall be either on the drawings or in the project manual. 2. Provide the calculations and other supporting documentation to justify the U-factors used for the roof and for the exterior walls in the Envelope Compliance Certificate. 3. Provide supporting documentation for the projection factor used for the west-facing windows with the louvered aluminum shade mounted below the top of the window. Reference: Section C402.3.3, IECC 2012. 4. Provide clarification of the "start-stop basis" for the exhaust and supply fans. Reference: Section 401.3, IMC 2012. 5. Provide structural details to show how the fan coil units, exhaust fan, supply fan, and propeller fan are to be connected to the building structure. Reference: Section 302.1, IMC 2012. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/04/2013 | CPIERCE1 | REJECT SHELF | Completed |