Permit Number: T13CM05957
Parcel: 13323090A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM05957
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/30/2013 MARTIN BROWN FIRE REVIEW Denied Please update to 2012 Codes
10/07/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. All listed codes are incorrect. Please revise list to the 2012 IBC Series with exception of the 2011 NEC
a. All accessibility codes are to be as per 2012 IBC, Chapter 11 and 2009 Edition ICC A117.1.
2. Please reviese all drawings and designs to the current codes and resubmit.
3. Please provide complete set of approved building shell drawings.
4. Provide structural details and calculations for the support of the water heater and storage tank.
5. Revise all lettering on these documents that are smaller than 3/32" actual, both upper and lower case and resubmit.
6. Additional comments forthcoming with resubmittal.
END OF REVIEW
10/11/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM05957
7890 E Speedway BL
Starbucks

Electrical Plans denied for the following:
1. Using the 2011 NEC, indicate on cover and electrical sheets.
2. Following items are per City of Tucson Submittal Requirements:
Provide a one line diagram showing Main Service and Panels A and B along with all other services that may be on this service.
Provide a fault current analysis beginning at service on through Panels A and B. Indicate how fault current brought down to 10kaic in panels if required.
Provide existing Main Service load total which includes Panels A and B.
Provide complete panel schedules for A and B showing individual circuit loads and balance all phases to within 15%.

Ray T Majuta
PDSD, Tucson
Electrical Plan Review
10/11/2013
Ray.Majuta@tucson az.gov
10/21/2013 ROBERT SHERRY WATER REVIEW Approved
10/21/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2012.
2. The plumbing plans show the water heater located above the service sink. Provide a design for mounting the water heater above the service sink along with structural calculations to show that the water heater is safely supported. Reference: Section 301.2, IPC 2012.
3. Provide tempered water for the lavatories using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012.
4. Provide the listing information for the proposed thermostatic mixing valve at the hot water heater. Reference: Sections 303.4, 607.1.2, and 613.1, IPC 2012.
5. Provide the specifications and listing information for the proposed water heater. (Note that the local gas utility, Southwest Gas, will provide gas service at 7" WC, not 8 oz. per square inch.) Reference: Sections 303.2 and 501.5, IPC 2012 and Section 107.2.1, IBC 2012.
6. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. "Reference only" details are not acceptable. Reference: Sections 502.1, 503.1, 503.2, 504, 606.1, and 607.3 IPC 2012.
7. Provide calculations showing how the water supply piping has been sized. Reference: Sections 604.1 and 604.3, IPC 2012.
8. Verify that the pipe sizes called out for the flush valves will not result in water velocities greater than that recommended by the pipe manufacturer (e.g. limit the water velocity to less than 8 FPS for copper, PEX, or CPVC piping). Reference: Table 604.3, IPC 2012.
9. Verify that all of the vents located within the building rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2012.
10. Provide protection of the trap seals for all floor drains subject to infrequent use. Reference: Section 1002.4, IPC 2012.
11. Provide sizing calculations for the gravity grease interceptor. Verify that the 500-gallon gravity grease interceptor is adequate for the proposed load. Reference: Section 1003.3, IPC 2012, as amended by the City of Tucson.
10/21/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Provide calculations demonstrating adequate ventilation using the current code (2012 IMC). Reference: Section 403.2, IMC 2012.
11/01/2013 CPIERCE1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed IMPACT FEES PAID ON SHELL; T13CM04304