Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM05833
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/23/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
09/23/2013 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
09/24/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13cm05833 350 E Congress #120 1. Sheet A1 shows 2 new service panels, provide a discription by way of one line diagrams showing service entrance conductors, where they originate from,grounding system, voltage and amperage discriptions. The Hvac equipment cannot be permitted untill electrical information for equipment provided such as circuit identification, conductor sizes, disconnect sizes etc. Ray T Majuta Elect Plan Review 9/24/2013 520/837/4988 |
09/24/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Where is FC-1 to be located? 2. Show how the mechanical equipment is to be connected to the building structure (detail 2/M1) |
09/24/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET TS1; CODE STUDY: THE OCCUPANCY GROUP IS CALLED OUT AS M (SEE #3), WHILE THE GENERAL BUILDING SUMMARY LISTS THIS AS A-2. COORDINATE. 2. SHEET TS1; CODE STUDY: THE OCCUPANCY LOAD (SEE #6) INDICATES A MERCANTILE USE. THE OCCUPANCY LOAD IS THEN CALCULATED ON AN ASSEMBLY USE. COORDINATE. 3. SHEET A1; WALL TYPES 6A AND 6B: THE DEMISING WALLS REQUIRE ONE LAYER OF TYPE X GYPSUM BOARD ON EACH SIDE OF THE WALL. REVISE. 4. SHEET A1; FLOOR PLAN: A NOTE AT THE EAST DEMISING WALL REFERENCES DETAIL 2/A1. REVISE. 5. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
09/24/2013 | ROBERT SHERRY | WATER | REVIEW | Passed | |
09/24/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Clarify the scope of the new work and expand the cryptic notes (e.g. "new drain line to existing stub line", "new gas line sub out"). |
09/24/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
09/24/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/08/2013 | GERRY KOZIOL | WWM | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/08/2013 | SHANAE POWELL | OUT TO CUSTOMER | Completed |