Permit Number: T13CM05731
Parcel: 11308207D

Address:
2802 N 1ST AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM05731
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/18/2013 DAVID RIVERA ZONING REVIEW Approved
09/18/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Verify the termination point of the roof drains. Condensate drains may not terminate over a roof drain unless the roof drain itself terminates at or above grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2012, as amended by the City of Tucson.
09/18/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
09/18/2013 ROBERT SHERRY WATER REVIEW Approved
09/18/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
09/18/2013 JASON GREEN ENGINEERING REVIEW Approved
09/18/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow (see P103). Reference: Sections 708.3.5 and 708.5, IPC 2012.
09/18/2013 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/19/2013 MARTIN BROWN FIRE REVIEW Approved
10/11/2013 FRODRIG2 WWM REVIEW Completed