Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM05628
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/20/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Provide certification for required special inspectors. 2. The minimal size of letters on construction documents is 3/32" actual, upper and lower case. The following sheets are not in compliance and must be revised and resubmitted: A9.13, A9.14, ASP.1, ASP.2, All FS drawings, E2.2, E3.1, FA1.1A, F1.2, P4.2, and P4.3. 3. Provide structural calculations and structural details for the following: a. All new roof top mounted HVAC equipment b. All kitchen exhaust hoods c. All tanks d. Low temp racks and ice machine e. Roof mounted electrical tranformer END OF REVIEW |
09/24/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM05628 5870 E Broadway Bl #440 Yard House Electrical Plans denied, please provide a response sheet and address each item. 1. E-4.2A , Note 29 makes reference to 2008 NEC , remove and install 2011 NEC. Sheet SP1.2 indicates 2011 NEC to be used. 2. E-4.2B, Note 43 refers to E-6.2 which shows Distribution Switchboard DB being integrated with CPI panels. Please indicate on this sheet ---"Switchboard DB---" rather than just CPI Panels. 3. E-4.2B, Note 49 "refer to Roof Plan on Sheet E-5.1", there is no Sheet E-5.1. 4. E-5.1B, concerning the 500KVA Transformer on roof, Building Plans Examiner has requested structural calculations for support off, provide a specification sheet which includes it's weight. 5. E-6.1, Refrigeration Rack, provide a specification sheet showing it's electrical information. 6. E-6.1, provide a fault current analysis beginning at landlords Switchboard, on through to the individual panels. 7. Provide information from landlord, concerning the size of the Landlords Switchboard and available ampacity in switchboard for this space. 8. Provide a location on plan for Landlord Switchboard, and Switchboard MSA. 9. The 200 amp OC device for Panel C2 at Switchboard is 200 amp , the feeder is rated for 150 amps and the bus at panel rated 125 amp ? 10. E-6.1, MAS-14 going to 24' Big Ass Fan is not shown on Switchboard MSA . 11. E-6.1, the 300 amp circuit for the Ref Rack (E-10) shown coming off Switchboard DB, is this the same unit marked " Low Temp Rack" shown on Sheet E-5.1B ? This unit shows a marking (MSA-13) on the Roof Plan , on the disconnect means, then MSA-13 on the Feeder Schedule in Sheet E-6.1 shows this feeder going to MUA-2. The confusion is MUA-2 comes of a 15 amp overcurrent device off SWBD DB ? Ray T Majuta Elect Plan Review PDSD, City of Tucson 9/26/2013 Ray.Majuta@tucsonaz.gov 520-837-4988 |
09/26/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/10/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 3/32-inch. Reference: Section 107.2.1, IBC 2012. 2. Provide a site drawing showing the location of the proposed gravity grease interceptor, the size, route, and slope of the new building sewer, the location of all cleanouts in the building sewer, and the location of the connection of the new building sewer to the public sewer. Reference: Section 107.2.1, IBC 2012. 3. Water heaters with a heat input of 200,000 BTU per hour or more, an operating water temperature of 210º F or greater, and a nominal water containing capacity of 120 gallons or more are required to comply with the rules contained in Article 4 (Arizona Boilers and Lined Hot Water Heaters) of the Arizona Administrative Code. http://www.azsos.gov/public_services/Title_20/20-05.htm#ARTICLE_4. 4. Provide the third-party listing information for the specified Sweet Air vent caps. Reference: Section 303.4, IPC 2012 (also note item 81 of the Plumbing General Notes). 5. The reduced pressure principle backflow prevention assembly being installed in the rear service area (room 116) does not appear to have an indirect waste receptor to catch any discharge from relief section of the backflow preventer as referenced in the manufacturer's installation instructions. Show how the valve assembly will be installed correctly and in a manner consistent with the manufacturer's instructions. Reference: Section 303.2, IPC 2012. 6. Revise the specified pipe/tubing support spacing shown in detail 15/P1.2 to comply with the intervals shown in Table 308.5, IPC 2012 for the materials being used. Verify that the expansion and contraction of the hot water CPVC piping will be accommodated. Reference: Section 308, IPC 2012. 7. The Material Schedule on sheet P1.1 calls for CPVC pipe and fittings to be used for above-ground soil, waste, and vent use. CPVC is not included in Table 702.1, IPC 2012 as an approved material. Provide justification for this material selection. Specify how the CPVC is to be joined to the PVC pipe used underground. Reference: Section 104.1, IBC 2012. 8. Revise the size of the combination drain and vent pipe in the bar area to correspond to the requirements of Table 915.3, IPC 2012. 9. Provide accessible cleanouts in the island sink vent system to permit rodding of all portions of the vents located below the flood rim of the fixture. Reference: Section 916.3, IPC 2012. |
10/10/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
10/11/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Demonstrate energy code compliance for the addition to the building envelope and all new mechanical equipment using calculations based on the current code. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012. 2. Show that the proposed HVAC system meets the control requirements of Sections C403.2.4 and C403.3. Reference: Section C303.1, International Energy Conservation Code 2012. 3. Revise Remark #5 in the Packaged Air Conditioning Unit Schedule to agree with the mechanical plans and with Section 606.2.1, IMC 2012. 4. Clarify keynote #17 located over the pizza hood on sheet M3.1B and keynote #14 located over the west prep hood, also on sheet M3.1B. Reference: Section 107.2.1, IBC 2012. 5. Coordinate the A/C Logic and Control Panel diagram on sheet M5.1 with the equipment schedules and mechanical plans for this project. Reference: Section 107.2.1, IBC 2012. 6. Clarify the ¾" condensate drain (shown on sheet P2.3B, keynote #20) from the roof. What equipment is it from and why is it not included in the sizing notes for the condensate drain piping. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/20/2013 | CPIERCE1 | REJECT SHELF | Completed |