Permit Number: T13CM05500
Parcel: 13014447A

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T13CM05500
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/08/2013 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: New Office Building - 1305 S. Alvernon Way.
T13CM05500
Building Plan (1st Review)

TRANSMITTAL DATE: October 8, 2013

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

3. Until the development package has been approved the building plans cannot be approved.

4. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
10/08/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM05500
New Office Bldg, Progressive
1305 S Alvernon

1. Last review requested a fault current analysis, only provide fault current values at service, panels and HVAC equipment.
Provide a complete fault current analysis showing how breakdown occurs beginning at service and on to all panels. If Series Rated systems or fully rated breakers need to be used please indicate on plan.

Ray T Majuta
Elect Plan Review
PDSD, Tucson
10/9/2013
Ray.majuta@tucsonaz.gov
520-837-4988
10/11/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
10/15/2013 LOREN MAKUS ENGINEERING REVIEW Denied The development package must be approved first.
10/15/2013 KEN BROUILLETTE FIRE REVIEW Approv-Cond AN AUTOMATIC FIRE SPRINKLER SYSTEM DESIGNED TO NFPA 13 WILL BE INSTALLED PER OWNER.
10/16/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
10/16/2013 ROBERT SHERRY WATER REVIEW Approved
10/16/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The floor drains in the MDF room and the men's restroom are now shown with horizontal vents below the floor level. [Initial comment: Verify that all of the vents within the building rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2012.]
2. The new vent has been shown upstream of the sand/oil separator; relocate the vent to the downstream side of the separator. [Initial comment: Provide a vent downstream of the sand/oil separator to protect the seal for the sand/oil interceptor. Reference: Section 1003.9, IPC 2012.]
3. Based on Table 402.4(2), IFGC 2012, some of the gas pipes are undersized (e.g. 1982 CFH requires a 4" pipe, 741 CFH requires a 2-1/2" pipe). [Initial comment: Provide natural gas pipe sizing calculations. Include the developed pipe lengths on plans. Reference: Section 402.3, IFGC 2012.]

Final Status

Task End Date Reviewer's Name Type of Review Description
10/30/2013 AROMERO4 APPROVAL SHELF Completed
10/30/2013 AROMERO4 OUT TO CUSTOMER Completed
10/30/2013 CPIERCE1 REJECT SHELF Completed