Permit Number: T13CM05430
Parcel: 117050710

Address:
347 N 4TH AV

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T13CM05430
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/26/2013 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Hookah Storage Building - 347 N. 4th Avenue
T13CM05430
Building Plan (1st Review)

TRANSMITTAL DATE: September 26, 2013

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

3. Until the development package has been approved the building plans cannot be approved.

4. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
10/10/2013 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
10/10/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied SHEET A1
1. Provide South and West Exterior Elevations
2. Provide detail section of stone veneer attachment
SHEET A2
3. At detail 1-1, clearly show 2 layers of 5/8" "X" rated gypson board on south wall.
4. The parapet stucco cap will crack and leak. The standard detail for this situation is to provide a continous horizontal 2 x nailer with a 2 x sloped cap, 30 pound felt and a galvanized sheet metal cap flashing.
SHEET S3
5. Detail 1: This does not appear to be the proper solution for this footing to footing situation. Please provide calculations showing that fence footing will carry the building weight or consult with a structural enginerr for proper chusioning and expansion separation for each foundation to act independently of each other.
END OF REVIEW

Final Status

Task End Date Reviewer's Name Type of Review Description
10/21/2013 CPIERCE1 OUT TO CUSTOMER Completed
10/21/2013 CPIERCE1 REJECT SHELF Completed