Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T13CM05168
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/22/2013 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | Meracado approval stamp must be placed on all sheets. |
08/22/2013 | JEFF DRUMM | LANDFILL | REVIEW | Approved | |
08/22/2013 | MICHAEL ST. PAUL | NPPO | REVIEW | Passed | |
09/12/2013 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Denied | T13CM05168 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide revised plans and calculations, highlighting any changes or with a written response to each of the notated items indicating action taken. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2012 International Residential Code and 2012 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL REQUIREMENTS: All engineers and architects involved in the design of the structure are to seal the related sheets of plans, details and calculations in accordance with the rules of the State Board of Technical Registration. FOUNDATION PLANS: 1. Show compliance with termite treatment, R320. 2. Notate the grade away from foundations with a minimum 6" fall within the first 10', R401.3. Clarify Foundations note #2 sheet S1.0. FLOOR PLANS: 1. Provide a handrail for the exterior stairway of four or more risers, R311.5.6. Show a handrail at the stairway leading to the entry. STRUCTURAL PLANS: 1. Identify the structural elements on the Floor Framing Plan at the "line on 2nd floor wall", R301.1. PLUMBING PLANS: 1. Clarify the total gas demand of 296 CFH rather than 246CFH. 2. Show gas pipe sizes in compliance with connected demand, G2413.3 & Table G2413.4(1). The total demand of 296 CFH with a total developed length of 88' requires a 1-1/4" pipe size. A 1" pipe may supply no more than 207 CFH. A ¾" pipe may supply no more than 110 CFH. If you have any questions please contact: Ken Van Karsen (520) 837-4912 City of Tucson Residential Plan Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/25/2013 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |
09/25/2013 | CPIERCE1 | REJECT SHELF | Completed |