Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T13CM05148
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/22/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 08/23/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The roof drainage calculations submitted for the existing roof along with the new tower roof are incorrect. Table 1106.3 is for horizontal pipes running full, not for semi-circular gutters which are sized using Table 1106.6, IPC 2012. Based on Table 1106.6 and assuming a slope of ΒΌ" per foot and three downspouts, the minimum gutter size is 10", not 6". Provide the slope of the gutters. Reference: Sections 1106 and 1108, IPC 2012. 2. Clarify how the new tower roof is to drain onto the existing roof. |
| 08/23/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Complete the Envelope Compliance section of the energy calculations for the building envelope to show compliance to Section C401.2, IECC 2012. The output submitted for COMcheck shows "Envelope Fails". 2. Complete the Envelope Compliance Certificate by checking the appropriate line items in Section 3, the Air Leakage, Component Certification, and Vapor Retarder Requirements. Supporting documentation shall be either on the drawings or in the project manual. The project manual shall be sealed per Section R4-30-304 of the Rules of the Board of Technical Registration. 3. Revise the energy code analysis for the building envelope, coordinating the building components used in the analysis with those shown on the drawing (e.g. R-19 batt insulation in the furr-in cavity is not continuous insulation, no insulation is called out for the new roof, etc.). Reference: Section C303.1, IECC 2012, as amended by the City of Tucson. 4. Complete the Mechanical Compliance Certificate by checking the appropriate line items in Section 4, the Requirements Checklist. Supporting documentation (e.g. automatic start controls, automatic shut-off dampers for exhaust and intake openings, commissioning, etc) shall be either on the drawings or in the project manual. 5. Full compliance with the 2012 IECC requires that an "additional efficiency package option" be selected per Section C406. Identify which of the three options has been selected. |
| 08/23/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/30/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET T1.1; GENERAL BUILDING SUMMARY: THE 'ACTUAL BUILDING AREA' LISTED IN THE TABLE IS 21,964 SF, WHILE THE BREAKDOWN LISTS 13,569 AND 8372 SF (TOTAL OF 21,968 SF), AND THE PARKING CALCULATIONS LIST 22,000 SF. CLARIFY. 2. SHEET T1.1; OCCUPANCY/EXIT PLAN: THE SUITE ON THE LEFT SIDE (8372 SF) SHOULD BE DESIGNATED AS SUITE B. VERIFY. 3. SHEET T1.1; OCCUPANCY/EXIT PLAN: SUITE B HAS TWO NOTES FOR DISTANCE BETWEEN EXITS (149' AND 200'). CLARIFY. 4. SHEET D1.1; DEMOLITION FLOOR PLAN: IN THE SOUTHEAST AREA OF THE BUILDING, THERE IS A ROOM WITH TWO KEYNOTES THAT ARE NOT LEGIBLE. REVISE. 5. SHEET D2.1; KEYNOTES: NOTE 2 WAS NOT LOCATED ON THE ELEVATIONS. VERIFY. 6. SHEET AS1.1 (DETAIL 5); SHEET S0.2 (DETAIL 013): COORDINATE THE PIER SIZE AND THE DEPTH OF THE PIER BELOW FINISH PAVING FOR THESE TWO DETAILS. 7. SHEET A1.1; KEYNOTES: NOTES 3 AND 19 WERE NOT LOCATED ON THE PLAN. VERIFY. 8. SHEET A2.1; KEYNOTES: NOTE 3 WAS NOT LOCATED ON THE ELEVATIONS. VERIFY. 9. SHEET A4.1; KEYNOTES: NOTE 3 ON SECTIONS 1 AND 2 IS POINTED TO THE WRONG BUILDING ELEMENT. REVISE. 10. SHEET A5.1; KEYNOTES: NOTE 8 WAS NOT LOCATED ON THE SECTIONS. VERIFY. 11. SHEET A7.1; DETAIL 9: THE DISTANCE FROM THE FINISHED CONCRETE SLAB TO THE BOTTOM OF THE SIGN SHOULD BE 7'-0". REVISE. 12. SHEET S1.1 (FOUNDATION PLAN); SHEET S4.2: TWO ELEVATON REFERENCES ON GRID 3 BETWEEN GRIDS A AND B INDICATE 419. ADD ELEVATION 419 TO THE DRAWINGS. 13. SHEET S2.1; ROOF FRAMING PLAN: ALONG GRID 3, MOVE THE STEEL BEAM DESIGNATIONS (W16X45) SO THE SIZES ARE LEGIBLE. 14. SHEET S2.1 (ROOF FRAMING PLAN); SHEET S4.2 (DETAIL 417): IS THE DETAIL CUT 417 ON THE PLAN (AT GRID 3 BETWEEN GRIDS H AND J) CORRECT AT THIS LOCATION? VERIFY. 15. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 09/04/2013 | JASON GREEN | ENGINEERING | REVIEW | Reqs Change | Need an approved DP Package for all proposed on site changes. T13CM05148 is for a new shell building only however proposed plan is showing revisions to the parking area and striping. |
| 09/05/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM05148 5555 E 5TH ST New Shell 1. Sheet E5.1, showing 5 sets of 4 #350 AL which provide only 1250 amps for the 1600 amp service ? Per 310.15, 75 degree C column, 2011 NEC. 2. The 2012 Outdoor Lighting Code requires the color temperature of light sources ( lamps and fixtures) not to exceed 3500K, cannot find this value anywhere on the spec sheets. Per Section 402.1. ODLC. Ray Majuta Elect Plan Review PDSD, C of T, 9/6/2013 Ray.Majuta@tucsonaz.gov 520/837/4988 |
| 09/13/2013 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: 5555 E. 5th Street T13CM05148 Building Plan (1st Review) TRANSMITTAL DATE: September 13, 2013 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 3. Until the development package has been approved the building plans cannot be approved. 4. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/01/2013 | AROMERO4 | OUT TO CUSTOMER | Completed |
| 10/01/2013 | CPIERCE1 | REJECT SHELF | Completed |