| 08/02/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 08/02/2013 | JASON GREEN | ENGINEERING | REVIEW | Needs Review | |
| 08/05/2013 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 08/05/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Show that each HVAC unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and start-up control and, if the control does not require manual changeover from the heating and cooling modes, restricts set point overlap. Reference: Section C403.2.4, IECC 2012. |
| 08/05/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. Provide structural calculations for the following: a. Sheet S-1 b. Wall mounted water heater WH-1 including the wall analysis c. Water heater 2 top of partition support detail 2. Please remove all clouded changes on the drawings. Revisions are identified as a change on the drawings only after the permit has been issued. 3. Reference all large scale details and elevations shown on sheets A301, A402 and A403. SHEET A100 4. Provide for two drinking fountains as per the 2012 IBC, Section 1109.5 and ICC A117.1, Section 602. 5. Provide a large scale detail for all new stairs and ramps showing all accessible requirements such as dimensions, exact finished floor elevations and differences, slopes, sections, door clearances and handrails as required by ICC A1171., Sections 404.2.3.2 and 405. a. Provide all handrail elevations. b. Provide structural construction details and calculations. SHEET A101 6. Show the office area reference to Sheet A102. 7. Confirm all floor elevation differences for all new stairs and ramps and show difference on drawings. a. Calculate required risers and treads and show on drawings. b. Show slope of all ramps and ramp run lengths as per elevation difference. 8. Provide a 5' turn around in vestible 203. SHEET A102 9. Provide a 3' wide accessible urinal stall and at detail 1/A402. SHEET S-1 10. Provide structural engineers seal and signature. END OF REVIEW |
| 08/05/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/05/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide the number of drinking fountains that complies with the requirements of Section 1109.5.1, IBC 2012. |
| 08/07/2013 | MARTIN BROWN | FIRE | REVIEW | Denied | Width of rolling gate shown as 32' on sheet C01, 24' on preliminary layout sheet. Please clarify. Add notes indicating new access gates will comply with section 503.5 of 2012 IFC. Proof of current annual sprinkler inspection will be required before final fire inspection. Indicate location of fire department approved lock boxes to be installed (gate, fire riser room, front door. |
| 08/08/2013 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 08/08/2013 | CPIERCE1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |