Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T13CM04637
Parcel: 14002010A

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T13CM04637
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/31/2013 MARTIN BROWN FIRE REVIEW Approved
08/02/2013 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: 3950 E. Irvington Road - New Metal Building.
T13CM04637
Building Plan (1st Review)

TRANSMITTAL DATE: August 2, 2013

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning can not approve the building plans until a development package has been submitted and approved.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
08/15/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET G-1; GENERAL NOTES: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE.
2. SHEET S2.0; DETAIL 102: A NOTE ON THE UPPER LEFT INDICATES "EMBED ANCHOR BOLTS-PER SCHEDULE". THERE IS NO SCHEDULE. SHOULD THIS NOTE BE REMOVED (NOTE ON THE RIGHT INDICATES "ANCHOR BOLTS")? VERIFY.
3. SHEET S2.0; DETAIL 102: A NOTE ON THE RIGHT INDICATES "ANCHOR BOLT EMBEDMENT". SHOULD THIS ALSO REFERENCE THE METAL BUILDING MANUFACTURER? VERIFY. REMOVE A DIMENSION LINE ON THE LEFT SIDE INDICATING THE SAME INFORMATION.
4. SHEET A-1; FLOOR PLAN: THE NORTH WALL BETWEEN GRIDS 10 AND 11 DOES NOT INDICATE AN 'OPEN BAY' (AS DO ALL OTHER BAYS). CLARIFY.
5. SHEET A-2; NORTH ELEVATION AND SOUTH ELEVATION: THE ELEVATIONS SHOW A BUILDING EXTENDING FROM GRID LINES 1 THROUGH 9, WHILE THE FLOOR PLAN ON SHEET A-1 SHOWS GRIDS 1 THROUGH 11. CLARIFY.
6. SHEET A-2; NORTH ELEVATION: NOTE 5 SHOULD INCLUDE VERBIAGE THAT THE X-BRACING IS LOCATED IN THE SOUTH WALL.
7. SHEET A-2; SECTION 5: THE TITLE SHOULD BE REVISED TO 'ENDWALL SECTION'. VERIFY.
8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
08/27/2013 ELIZABETH EBERBACH ENGINEERING REVIEW Approved Once Zoning comments are completed, Engineering will stamp plans.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/03/2013 CPIERCE1 REJECT SHELF Completed