Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T13CM04637
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/31/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
08/02/2013 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: 3950 E. Irvington Road - New Metal Building. T13CM04637 Building Plan (1st Review) TRANSMITTAL DATE: August 2, 2013 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning can not approve the building plans until a development package has been submitted and approved. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
08/15/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET G-1; GENERAL NOTES: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE. 2. SHEET S2.0; DETAIL 102: A NOTE ON THE UPPER LEFT INDICATES "EMBED ANCHOR BOLTS-PER SCHEDULE". THERE IS NO SCHEDULE. SHOULD THIS NOTE BE REMOVED (NOTE ON THE RIGHT INDICATES "ANCHOR BOLTS")? VERIFY. 3. SHEET S2.0; DETAIL 102: A NOTE ON THE RIGHT INDICATES "ANCHOR BOLT EMBEDMENT". SHOULD THIS ALSO REFERENCE THE METAL BUILDING MANUFACTURER? VERIFY. REMOVE A DIMENSION LINE ON THE LEFT SIDE INDICATING THE SAME INFORMATION. 4. SHEET A-1; FLOOR PLAN: THE NORTH WALL BETWEEN GRIDS 10 AND 11 DOES NOT INDICATE AN 'OPEN BAY' (AS DO ALL OTHER BAYS). CLARIFY. 5. SHEET A-2; NORTH ELEVATION AND SOUTH ELEVATION: THE ELEVATIONS SHOW A BUILDING EXTENDING FROM GRID LINES 1 THROUGH 9, WHILE THE FLOOR PLAN ON SHEET A-1 SHOWS GRIDS 1 THROUGH 11. CLARIFY. 6. SHEET A-2; NORTH ELEVATION: NOTE 5 SHOULD INCLUDE VERBIAGE THAT THE X-BRACING IS LOCATED IN THE SOUTH WALL. 7. SHEET A-2; SECTION 5: THE TITLE SHOULD BE REVISED TO 'ENDWALL SECTION'. VERIFY. 8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
08/27/2013 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | Once Zoning comments are completed, Engineering will stamp plans. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/03/2013 | CPIERCE1 | REJECT SHELF | Completed |