Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T13CM04463
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/20/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
08/20/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Comment not addressed. Verify the termination point of the roof drains. Condensate drains may not terminate over a roof drain unless the roof drain itself terminates at or above grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2012, as amended by the City of Tucson. |
08/20/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Some of the proposed appliances (e.g. dishwasher, Concordia) require incoming water pressure in excess of the 15 PSI minimum flow pressure shown in the water calculations. Verify that the water distribution system can provide the flow pressure prescribed by the fixture or appliance manufacturer, which ever is greater. Reference: Section 604.3, IPC 2012, as amended by the City of Tucson. 2. Comment not resolved. An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow (see detail E13/P100 and plumbing plan A1/P100). Reference: Sections 708.3.5 and 708.5, IPC 2012. |
08/29/2013 | CPIERCE1 | FIRE | REVIEW | Needs Review |