Permit Number: T13CM04363
Parcel: 11711102A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM04363
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/19/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved 1. Show how the revised can wash receptor basin will be constructed. The receptor shall be lined with a waterproof membrane listed for this purpose and there shall be a waterproof joint between the membrane and the drain outlet. Reference: Sections 412 and 417.5.2, IPC 2012.
2. Show the sizes of the drain pipes.
07/22/2013 JASON GREEN ENGINEERING REVIEW Denied Building Plan will be approved upon approval of a required DP Package for the site expansion. JG
07/23/2013 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Reilly Craft Pizza - Beer Garden
T13CM04363
Building Plan (1st Review)

TRANSMITTAL DATE: July 23, 2013

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning can not approve the building plans until the development package has been submitted and approved. The proposed project does not match the last approved development package D12-0197.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
07/29/2013 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Approved Provide egress per IBC chapter 10. Include proper door swing, sufficient # of exits and eliminate egress through food prep area.

Original approved plans for beer garden demonstrate compliance with IBC egress requirements. You may return to using those documents for egress.
07/30/2013 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved
08/06/2013 KEN BROUILLETTE FIRE REVIEW Approv-Cond COMPLY WITH REDLINE COMMENTS FROM BUILDING

Final Status

Task End Date Reviewer's Name Type of Review Description
11/06/2013 CPIERCE1 OUT TO CUSTOMER Completed
11/06/2013 CPIERCE1 REJECT SHELF Completed