Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T13CM04149
Parcel: 11901042B

Address:
200 E BENSON HY

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM04149
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2014 SPOWELL1 WWM REVIEW Needs Review
07/09/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A1.0: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE THIS SHEET.
07/09/2013 ROBERT SHERRY WATER REVIEW Denied Provide the size of both the water service meter and the reduced pressure backflow preventer assembly and state the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2012.
07/09/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
07/09/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Show the slope of the horizontal grease duct. Reference: section506.3.7, IMC 2012.
2. Show the sizes and locations of the cleanouts for the grease duct. Reference: Sections 506.3.8 and 506.3.9, IMC 2012.
3. The practice of using grease duct enclosure material (i.e. fire wrap blanket) to provide clearance to combustibles where a hood penetrates a ceiling has been specifically prohibited by Section 507.10, IMC 2012 because the grease duct enclosure material has not been listed for this use. See Section 506.3.11, IMC 2012 for the hood enclosure requirements.
4. Provide details to show that the Type I hood is supported from the building structure in accordance with Section 507.6, IMC 2006 (Detail 3/M2.1 is missing). Reference: Section 302.1, IMC 2012.
5. Show that the outlet of fan GEF-1 complies with the requirements of Section 506.3.13.3, IMC 2012.
07/09/2013 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
07/09/2013 JASON GREEN ENGINEERING REVIEW Approved
07/09/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the installation of the hydromechanical grease interceptor to comply with the manufacturer's installation requirements (the unit has an integral flow control device). Reference: Section 303.2, IPC 2012.
2. Provide indirect waste pipes for each compartment of the 3-compartment sink. Provide separate indirect waste pipes to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012.
07/10/2013 MARTIN BROWN FIRE REVIEW Approved
09/05/2013 STEVE SHIELDS ZONING REVIEW Approved