Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T13CM04098
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/12/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/12/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
08/12/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Complete the Envelope Compliance Certificate by checking the appropriate line items in Section 3, the Air Leakage, Component Certification, and Vapor Retarder Requirements. Sign and seal the Compliance Statement for the energy conservation code calculations. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. [Initial comment: Demonstrate energy code compliance for the building envelope using calculations based on the current code, the 2012 IECC. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Coordinate the components used in the calculations with the components shown on the drawing (e.g. the continuous roof insulation is noted as having a R-value of 9.4 on the calculations but only 7.1 on sheet A2). Reference: Sections C101.3, C101.5, C103.2, and C401.2, International Energy Conservation Code 2012.] 2. Complete the Mechanical Compliance Certificate by checking the appropriate line items in Section 4, the Requirements Checklist. Sign and seal the Compliance Statement for the energy conservation code calculations. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. [Initial comment: Revise the energy code compliance for the building mechanical system using calculations based on the current code. Verify that the equipment selected is capable of meeting the energy code requirements (e.g. the ductless A/C unit is not only incapable of economizer operation, but it is exempt from the requirement to have the capability of economizer operation). Complete the Mechanical Compliance Certificate by checking the appropriate line items in Section 4, the Requirements Checklist for the mechanical equipment.] |
08/20/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/28/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/24/2013 | CPIERCE1 | REJECT SHELF | Completed |
08/28/2013 | CPIERCE1 | APPROVAL SHELF | Completed |