| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/09/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 07/10/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 07/11/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM03957 14199 W Mile Wide Rd Oasis TM Tracker PV System Phase II 1. Please provide information on the following equipment in the form of specification or manufacture's cut sheets: Modules Combiners PCS units 1.5MVA Transformers. 1,000 V DC Disconnects 25 KVA Switchgear 2. Concerning 2011 NEC 690.4(D)," Equipment. Inverters,motor generators,photovoltaic modules,photovoltaic panels,source circuit combiners, and charge controllers intended for use in photovoltaic power systems,shall be identified and listed for the application", can confirmation be made for equipment used complying with this section ? 3. Please provide a site electrical plan showing locations for following equipment, some of this equipment is shown in structural sheets, some is not shown: 25 KV Switchgear 1.5MVA Transformers, PCS units (should these be identified apart from each other as #1 and #2), Combiners, 2- 1000 V DC Disconnects, 50 amp 690 VAC 3/P disconnect, T-02 Transformer, MTS-1, Panel A,which shows 2P/15 amp bkr's feeding nine 3P 15 amp breakers to tracker motors,( need a panel schedule and loads) T-03 Transformer, Panel B, Tracker motors. Is some equipment above part of one unit or to be individually installed ? If seperately installed, is the 50 amp disconnect attached to the 1.5MVA Transformer a tap on to the transformer? 4. Please provide information on fault current concerning equipment installed under this project. 5. Please clearify per 2011 NEC 690.15, is the main disconnect for the 1.5MVA Transformers to be the disconnect required by this section ? Ray T Majuta Elect Plan Review PDSD, Tucson 7/15/2013 Ray.Majuta@tucsonaz.gov |
| 07/23/2013 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Denied | Denied until DP13-0120 is approved and Floodplain Use Permits for elevation certificates for both proposed equipment pads are issued. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/07/2013 | CPIERCE1 | REJECT SHELF | Completed |