Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM03769
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/21/2013 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
06/21/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
06/21/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13cm03769 4805 E Speedway Bl 1. Cover sheet indicates 2008 NEC,we are under the 2011 NEC, change to 2011. 2. Provide a 2012 IECC Lighting Compliance Report, ComCheck ok. 3.Sheet E3.1 indicates the Fault Current Calculation for Panel A is 47,836 AIC, the panel schedule indicates 22,000. The panel needs to be at better than 47,836. Indicate if a Series Rated or Fully Rated System to be used. Ray Majuta Elect Plan Review PDSD, Tucson 6/21/2013 Ray.Majuta@tucsonaz.gov |
06/21/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/21/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Minimum actual (not font) lettering size is 3/32" for both upper and lower case. 2. Please provide a site plan. 3. Cannot access toilet rooms through storage rooms. 4. Correct accessibility code reference to 2009 Edition ICC A117.1. 5. Provide accessible water dispenser/s. 6. Do not show required exit from reception to storage room. All exiting through door D-2. 7. Provide structural calculations for platform mounted water heater. 8. Remove accessible door signage from middle of door, wall mounted on the strike side of the door as per ICC A117.1. END OF REVIEW |
06/21/2013 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
06/21/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
06/21/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/21/2013 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/03/2013 | GERRY KOZIOL | WWM | REVIEW | Approved |