Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM03745
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/20/2013 | DAVID RIVERA | ZONING | REVIEW | Approved | |
06/20/2013 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | |
06/20/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1; APPLICABLE CODES: REVISE THE NEC TO THE 2011 EDITION. REVISE THE ADA TO THE ICC/ANSI A117.1, 2009 EDITION. 2. SHEET A1; BUILDING CODE DATA: PROVIDE THE OCCUPANCY LOAD FOR THIS PROJECT, INCLUDING THE MEZZANINE. 3. SHEET A1.0; BUILDING CODE DATA: VERIFY THE SQUARE FOOTAGE ON THIS PROJECT (FIRST FLOOR AND MEZZANINE). 4. SHEET A2; ELEVATION 3: REMOVE THE ADAAG NOTE ON THE SIDE WALL, AND ADD A VERTICAL GRAB BAR PER ICC/ANSI FIGURE 604.5.1. 5. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
06/20/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
06/21/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show the control requirements for the HVAC systems on the drawing. Coordinate HVAC system with the Mechanical Compliance Certificate. 2. Clarify how the mezzanine office is to be provided with ventilation. 3. Provide the sequence of operation for the restroom fan; show that all of the air supplied to the room will be exhausted. 4. Verify that the ventilation requirements for the lab are equivalent to an office. |
06/21/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM03745 1991 E Ajo WY 1. Sheet E1 Panel A circuits 1,3 the 80 amp breaker is on #8 conductors which rated for 50 amps only. Need to have spec's on water heater to verify load and breaker size. 2. Panel A circuits 2,4 has a 40 amp breaker on #12 conductors rated for 25 amps only. Also the two phases should be equal, one leg is 2652 va and the other is 8652 va ? 3. Need to provide a new total load on 2500 amp Switchboard D which includes this new load (157). 4. There is an issue with the Mechanical Plans, the exhaust fan in bathroom must be energized when air is provided into room, not by switching. 5. Provide the fault current value at Panel A, and show location of panel and service on plan. Ray Majuta Elect Plan Review PDSD, Tucson 6/21/2013 Ray.Majuta@tucsonaz.gov |
06/21/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/21/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a riser diagram for the waste and vent piping. 2. Coordinate the water fixture units on the fixture unit schedule with the water calculations. 3. The maximum flow rates for plumbing fixtures shall be consistent with ARS Title 45, Chapter 1, Article 12. See text at: (http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp). 4. Provide product descriptions of the plumbing fixtures or state which standardsthey are to meet. |
06/24/2013 | KEN BROUILLETTE | FIRE | REVIEW | Denied | 1. PLEASE PROVIDE OCCUPANT LOAD CALCULATIONS |
08/02/2013 | AROMERO4 | WWM | REVIEW | Needs Review |