Permit Review Detail
Review Status: Active
Review Details: COMMERCIAL - TI
Permit Number - T13CM03710
Review Name: COMMERCIAL - TI
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/19/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 06/19/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 06/19/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM03710 2539 N Balboa #115 Denied 1. Sheet E3.0 shows the existing PV Disconnect to be re-routed to now connect at the line side of the 200 Main Disconnect for Panel A. To change out the existing lugs and install new would violate the listing on the Disconnect. Could not the 40 amp PV feeder be tied in a spare position in Panel A ? Or other means of termination would have to be approved, Ray Majuta Electrical Olan Review PDSD, Tucson 6/19/2013 |
| 06/19/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 06/19/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Needs point o9f use dispenser 2. Needs Service Sink 3. Break room sink to be maximum 2'-10" a.f.f. END OF REVIEW |
| 06/19/2013 | ANY | WWM | REVIEW | Active | |
| 06/19/2013 | ANY | PLUMBING-COMMERCIAL | REVIEW | Active | |
| 06/19/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 06/19/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 06/19/2013 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |