Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T13CM03188
Parcel: 119180870

Address:
3660 S 16TH AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM03188
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/03/2013 MARTIN BROWN FIRE REVIEW Approved
06/07/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide water supply isometrics. Reference: Section 107.2.1, IBC 2012.
2. Provide information to show how the proposed water heater is to be supported from the building structure. Reference: Section 301.2, IPC 2012.
3. Provide calculations showing how the water supply piping has been sized. Reference: Sections 604.1 and 604.3, IPC 2012.
4. Verify that the pipe sizes called out for the urinal flush valves will not result in water velocities greater than that recommended by the pipe manufacturer (e.g. limit the water velocity to less than 8 FPS for copper). Reference: Table 604.3, IPC 2012.
5. Provide the material standards for the water distribution piping materials and fittings. Reference: Sections 605.4 and 605.5, IPC 2012.
6. Specify the materials to be used for the drainage piping and fittings. Reference: Section 702, IPC 2012.
06/07/2013 ROBERT SHERRY WATER REVIEW Approved
06/11/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM03188
3660 S 16th
Burlington

1. Sheet E-1.0 Lighting plans missing in one set.
2. Sheet E-2.0 Circuit LB 57 shown used for Widespan Lighting, Panel LB only has 42 circuits.
3. Sheet E-2.1 Circuit LB 44 shown used at entrance, Panel only has 42 circuits.
4. Sheet E 4.0, the 45 kva transformer fed from Panel HA should have a 60 amp rather than a 30amp breaker.
5. Sheet E 4.0 the 45 kva transformer fed from Panel HB should have a 60 amp breaker rather than a 30 amp.
6. Sheet E 4.1, Panel HA does not show a breaker for the 45 kva transformer.
7. Sheet E 4.1, Panel HB does not show a breaker for the 45 kva transformer.
8. Provide a Fault Current calculation beginning at service on through all panels, NEC 110.22 and 24. Also indicate if panels and breakers are to be fully rated or series rated.
9. Sheet E 4.1, the Water Heater is not on circuit HB 18 as indicated rather on circuit 42.
10. Finish marking the checklist on the ComCheck calculation with boxes that apply.

Ray Majuta
Electrical Plan Review
PDSD, TUCSON
6/11/2013
Ray.Majuta@tucsonaz.gov
06/11/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. The conditioned spaces are served with ceiling supplies and ceiling returns; use equation 4.2, IMC 2012 to determine the zone air distribution effectiveness (Ez) for each zone. With gas-fired rooftop units, the Ez should be 1.0 during the cooling season and 0.8 during the heating season. Reference: Section 403.3.1.3, IMC 2012.
2. Revise the ventilation calculation for the rooms served by RTU-12 and RTU-12. The layaway/storage/receiving rooms are not classified as offices.
3. Revise the ventilation calculation for the rooms served by RTU-11. Units supplying multiple zones shall take into account the different occupancy loads in each zone. Note that the e-learning room and the break room appear to be more correctly identified as conference rooms. Reference: Section 403.3.2.3, IMC 2012.
4. Materials installed in plenums shall conform to Section 602.2.1, IMC 2012.
5. Demand-controlled ventilation is required for this activity. Reference: Section C403.2.5.1, IECC 2012.

Final Status

Task End Date Reviewer's Name Type of Review Description
06/21/2013 CPIERCE1 REJECT SHELF Completed