Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T13CM03173
Parcel: 140260360

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM03173
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/24/2013 STEVE SHIELDS ZONING REVIEW Approved
05/24/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
05/24/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM03173
2800 E Commerce Center
Replace 1 generator adding 3 New to Call Center

1. Sheets E-8.1, and E-8.2 concerning General Note #2, "Contractor shall field verify sizes and quantities of existing feeders to intercepted and extended. Sizes shown are from recorded drawings". Indicate if sizes other than shown on this drawing that they are to be installed as shown on this drawing.
2. The changes performed to existing SES-1 and SES-2 will require a verification from a Third Party Testing Laboratory approved by OSHA, written documentation to be provided to AHJ proir to energizing of SES-1 and SES-2. Indicate on Sheets E-8.1 and E-8.2. (2011 NEC 110.3).
3. The GFP of Equipment as per 2011 230-95, will need to be retested on SES-1 due to changes to being made, and new GFP system installed on SES-2. Notate on Sheets E-8.1 and E-8.2. Also indicate a written report to be given to AHJ prior to energizing of each.
4. Sheet E8.1, identify the sizes of overcurrent devices on UPS1 for L1 and L2.
L1 to refeed 112.5 kva T1 transformer with 150 amp feeder, sufficient for T1, however T4 at 225 kva is also being refed with 150 amp feeder, should this be a 350 amp feeder as previous ?


Ray T Majuta
Elect Plan Review
PDSD, Tucson
5/24/2013
Ray.Majuta@tucsonaz.gov
05/24/2013 MARTIN BROWN FIRE REVIEW Approved
05/24/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
05/24/2013 JASON GREEN ENGINEERING REVIEW Approved
05/24/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
05/24/2013 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed