Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM03173
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/24/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
05/24/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
05/24/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM03173 2800 E Commerce Center Replace 1 generator adding 3 New to Call Center 1. Sheets E-8.1, and E-8.2 concerning General Note #2, "Contractor shall field verify sizes and quantities of existing feeders to intercepted and extended. Sizes shown are from recorded drawings". Indicate if sizes other than shown on this drawing that they are to be installed as shown on this drawing. 2. The changes performed to existing SES-1 and SES-2 will require a verification from a Third Party Testing Laboratory approved by OSHA, written documentation to be provided to AHJ proir to energizing of SES-1 and SES-2. Indicate on Sheets E-8.1 and E-8.2. (2011 NEC 110.3). 3. The GFP of Equipment as per 2011 230-95, will need to be retested on SES-1 due to changes to being made, and new GFP system installed on SES-2. Notate on Sheets E-8.1 and E-8.2. Also indicate a written report to be given to AHJ prior to energizing of each. 4. Sheet E8.1, identify the sizes of overcurrent devices on UPS1 for L1 and L2. L1 to refeed 112.5 kva T1 transformer with 150 amp feeder, sufficient for T1, however T4 at 225 kva is also being refed with 150 amp feeder, should this be a 350 amp feeder as previous ? Ray T Majuta Elect Plan Review PDSD, Tucson 5/24/2013 Ray.Majuta@tucsonaz.gov |
05/24/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/24/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/24/2013 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
05/24/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
05/24/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |