Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM03102
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/22/2013 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
05/22/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show that the proposed HVAC system and equipment meets the requirements of Sections C403.2 and C403.3, IECC 2012 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. 2. The total cooling capacity of all of the cooling systems is nearly 755 MBH. Explain why economizers should not be provided to limit the total cooling capacity without economizers to less than 300 MBH for the building. Reference: Section C403.3.1, IECC 2012. 3. Provide calculations demonstrating adequate ventilation using the current code. Reference: Section 403.2, IMC 2012. 4. Provide information on the sequence of operation for the restroom exhaust fans to show that all of the air supplied to the restrooms will be exhausted with no more than 10% exhausted air being recirculated. Reference: Section 403.2.1 (4), IMC 2012. |
05/22/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
05/22/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
05/22/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | 1. PROVIDE STRUCTURAL CALCULATIONS FOR ALL NEW ROOD TOP MOUNTED HVAC UNITS. |
05/22/2013 | GERRY KOZIOL | WWM | REVIEW | Approved | |
05/22/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide backflow protection for the directly-connected testing equipment |
05/22/2013 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
05/22/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/22/2013 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |