Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM03097
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/21/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
05/21/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
05/22/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
05/22/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show that the proposed HVAC system and equipment meets the requirements of Sections C403.2 and C403.3, IECC 2012 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. 2. Revise the ventilation calculations to independently demonstrate adequate ventilation for each of the new A/C units. Reference: Section 403.2, IMC 2012. |
05/22/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET IA1.0 (FLOOR PLAN); SHEET IA3.0 (DETAIL 5): INTERIOR PARTITIONS MUST MEET THE STRENGTH REQUIREMENTS OF THE IBC SECTION 1607.14 FOR A 5 PSF HORIZONTAL LOAD. SHOW BRACING AT THE TOP OF THE WALL, AND CALL OUT SPACING, SIZE, AND CONNECTIONS OF THE BRACING TO THE TOP OF THE WALL AND TO THE STRUCTURE ABOVE, OR PROVIDE CALCULATIONS THAT INDICATE THE WALL WITH THE CORNER ANGLE BRACE MEETS THAT REQUIREMENT. 2. SHEET IA1.0; KEYNOTES: NOTE 4 INDICATES THE DRINKING FOUNTAIN IS 'FUTURE'. IF TENANTS ARE IN THE SPACE, A DRINKING FOUNTAIN IS REQUIRED NOW. VERIFY. 3. SHEET IA1.0; KEYNOTES: NOTE 11 INDICATES NEW DOCK LEVELERS. PROVIDE DETAILS. 4. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
05/22/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
05/22/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Install the proposed vacuum relief valve for the water heater per the manufacturer's listing information, i.e. with no valves located between the vacuum relief valve and the water heater. Reference: Section 303.2, IPC 2012. |
05/22/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
05/23/2013 | KEN BROUILLETTE | FIRE | REVIEW | Denied | The two exits noted by exit signs in the warehouse area are too close together. Please indicate on plan the location of the second exit that meets the diagonal separation distance and that provides a clear unobstructed path to the exit. |
05/30/2013 | GERRY KOZIOL | WWM | REVIEW | Approved |