Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM02816
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/09/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
05/09/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
05/09/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
05/09/2013 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide the size of both the water service meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2012. |
05/09/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1.0; DEMOLITION KEYNOTES: NOTES 5 AND 7 WERE NOT LOCATED ON THE PLAN. VERIFY. 2. SHEET A2.0; DETAIL 6: PROVIDE THE CONNECTOR SIZE FOR THE TIE WIRE TO THE ROOF STRUCTURE AND TO THE TOP OF THE PARTITION. 3. SHEET A2.0; KEYNOTES: NOTE 10 WAS NOT LOCATED ON THE PLAN. VERIFY. 4. GENERAL: PROVIDE STRUCTURAL CALCULATIONS. 5. SHEET S2.1: COLUMN C2 (FROM SHEET S1.3) WAS NOT LOCATED ON THE PLANS. VERIFY. 6. SHEET S3.1: DETAIL CUT 103 WAS NOT LOCATED ON THE PLANS ON SHEET S2.1. VERIFY. 7. SHEET S3.1; DETAILS 202 AND 203: WHERE DOES THE HSS 6X2 (SHOWN IN DETAIL 202) END AND THE HSS 8X2 (SHOWN IN DETAIL 203) BEGIN? CLARIFY. 8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
05/09/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
05/09/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide material standards for all plumbing fixtures being provided by others. Reference: Sections 303.4 and 402, IPC 2012. 2. Clarify the nature of the "treatment tank". Provide material standards for the tank and show how it is to be drained. 3. Provide specifications for the pumps located by the hand sinks and provide a detail shoe. 4. Provide the material standards for the water service and water distribution piping materials and fittings. Reference: Sections 605.3 and 605.5, IPC 2012. 5. Specify the materials to be used for the drainage piping and fittings. Reference: Section 702, IPC 2012. |
05/09/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
05/10/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/16/2013 | CPIERCE1 | WWM | REVIEW | Needs Review |