Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM02808
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/09/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
05/09/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show that each rooftop unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and start-up control and, if the control does not require manual changeover from the heating and cooling modes, restricts set point overlap. Reference: Section C403.2.4, IECC 2012. 2. Provide ventilation control per Section C403.2.5, IECC 2012. (Note that the submitted mechanical ventilation calculations are based on the 2006 IMC which results in more outside air than required by the 2012 IMC.) 3. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted with no more than 10% of the exhausted air being recirculated. Reference: Section 403.2.1 (4), IMC 2012. 4. Clarify the efficiency of the new heat pumps (9.7, 13, or 15 SEER). 5. Revise the references to the 2006 energy code to the appropriate requirements of the 2012 IECC. |
05/09/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM02808 7780 E Speedway Bl -1M 1. The Ex-fans in the restrooms are required to be switched independently from lighting per Mechanical Plans Examiner, see his review. 2. Circuit A-35,37 on Sheet E1.0 not the same in the panel schedule. 3. Circuit B-28 not in panel schedule, could be A-28. 4. Sheet E3.0, the #3 grd from the service gutter to the line side of 400 amp Main Disconnect to be #2 sized per 250-66 according to 250.102. The #3 ok after Main per 250-122. 5. Provide a drawing of entire service rather than a partial gutter, show all existing loads plus this new one for grand total.Show how existing loads obtained. Ray T Majuta Elect Plan Review PDSD, C of Tucson 5/9/2013 Ray.Majuta@tucsonaz.gov 520-837-4988 |
05/09/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
05/09/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/09/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
05/09/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The 2012 International Plumbing Code has been adopted by the City of Tucson. The use of the 2012 Uniform Plumbing Code is allowed provided an appeal to the building official is filed. There is no charge for this appeal. 2. Provide the anchor and lag screw sizes for detail 3/P3.0. 3. Provide tempered water for the lavatories and public hand-washing sinks using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. 4. Provide the plan view for the waste and vent piping. Show the sizes of the vent piping and the locations of the roof penetrations. |
05/09/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/09/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/05/2013 | AROMERO4 | WWM | REVIEW | Needs Review |