Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T13CM02629
Parcel: 140290480

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM02629
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/20/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide information to show how the proposed water heater is to be supported from the building structure. Reference: Section 301.2, IPC 2012.
2. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Sections 416.5, 607.1 and 607.1.2, IPC 2012 and Section C404.3, IECC 2012.
3. Provide a vacuum relief valve for the specified bottom-fed storage-type water heaters. (Note: the water heater detail incorrectly shows the hot water supply emanating from the bottom of the water heater tank and the hot water return piping connecting to the hot water supply piping.) Reference: Section 504.2, IPC 2012.
4. The drain from a pan located under a water heater shall terminate either to an indirect waste receptor or to the exterior of the building (see detail 3/M8.1). Reference: Section 504.7.2, IPC 2012.
5. The developed length of the hot water supply piping serving the sink in room 119 appears to be greater than fifty feet; provide a method for maintaining the temperature of this hot water supply system. Reference: Section 607.2, IPC 2012.
6. Materials exposed in plenums shall conform to Section 602.2.1, IMC 2012.
05/20/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Show the size, routing, and termination of the condensate drain from FCU-4. Reference: Sections 307.2.1, IMC 2012 as amended by the City of Tucson.
2. Show how natural ventilation has been provided for room 113; a room having an obstructed opening between it and an adjacent room having an opening to the exterior. Reference: Section 402.3, IMC 2012.
3. Provide calculations to show that the mechanical ventilation system is sized in accordance with Section 403.3, IMC 2012.
4. Positively pressurized exhaust ducts from areas allowed to have up to 10% recirculation per Section 403.2.1 item 4, may not pass through a plenum unless the duct is sealed in accordance with Section 603.9, IMC 2012. Reference: Section 601.4, IMC 2012.
5. Materials installed in plenums shall conform to Section 602.2.1, IMC 2012.
6. Show how the thermostatic set points for the heat pumps (noted in item C, detail 2/M7.1) comply with the requirements of Section C403.2.4.2, IECC 2012.
7. Provide for relief of excess outdoor air during economizer operation. Reference: Section 403.3.1.1.4, IECC 2012.
05/20/2013 ROBERT SHERRY WATER REVIEW Approved
05/21/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM02629

1. Per 2011 NEC-230.2, a building or structure shall be permitted to be supplied by one service unless permitted by 230.2 A thur D, two services appear to feed the unit. one from the utility transformer and one fron the 1200 amp SES.
2. Per 2011 NEC 230.71, the max number of disconnects for each service is not more than 6 in a single enclosure, with the addition of Unit 180, now 4 metered switches plus the 6 spare unused switches. In addition to over 6 switches ,the addition of feeders on to the line side of the SES consitutes a change to the SES, not sure how others shown have been connected, however changing the intended use of the SES would require a 3rd party verification.

Ray T Majuta
Elect Plan Review
PDSD, Tucson
5/21/2013
Ray.Majuta@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
06/04/2013 CPIERCE1 REJECT SHELF Completed