Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T13CM02495
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/13/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/13/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | In the mechanical systems list, all of the rooftop units are shown as having air economizers but in the requirements checklist, RTU-3 and RTU-5 do not have economizers. All of the units apparently are lacking a means of relieving the excess outside air during economizer operation. [Second comment: Complete the mechanical compliance certificate by checking the applicable boxes in the requirements checklist. Checked items shall be supported by specifications (i.e. on the drawings or book specifications) for the activity.] [Initial comment: Show that the proposed HVAC system and equipment meet the requirements of Sections C403.2 and C403.3, IECC 2012 (e.g. provide the mechanical energy code compliance certification from COMcheck based upon the 2012 IECC). Reference: Section C303.1, International Energy Conservation Code 2012. |
06/13/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
06/14/2013 | FRODRIG2 | FIRE | REVIEW | Denied | |
06/14/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please include structural calculations and structural details for the support of a 952 pound exhaust hood. Detail 1/S2.0 is designed for a 500 pound maxium weighted exhaust hood. |