Permit Number: T13CM02495
Parcel: 12517039A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM02495
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/03/2013 MICHAEL ST. PAUL ZONING REVIEW Denied CDRC TRANSMITTAL


FROM: Michael St.Paul, Planning Technician

PROJECT:
T13CM02495
3837 East Broadway Boulevard
Food Service


TRANSMITTAL: May 3, 2013


COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Unified Development Code and Technical Standards were addressed.


This site is located in the C-1, P and R-1 zone. It appears that a revised Development Package site plan shall be required. A large portion of the site is in the R-1 zone; therefore, letter of legal-non-conforming status shall be required.
05/03/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM02495
3837 E Broadway Bl.
TI Restaurant

1. Show locations of Panels A and B on electrical sheets.
2. Show location of Service on electrical sheets
3. The existing 1200 amp SES appears to feed the entire Strip Center. If so, show existing services on the one line including existing loads (and how obtained) plus new loads from this space for total. If 1200 amp SES feeds only this space indicate on one line diagram.
4. Circuits A-37,39,41 and A-38,40,42 on Sheet E2.0 should go to Panel B.

Ray T Majuta
Electrical Plan Review
PDSD, C of Tucson
5/3/2013
Ray.Majuta@tucsonaz.gov
05/08/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied SHEET A0.0
1. Revise the total occupant load to that as calculated from the 2012 IBC shown on sheet A0.1 for a total of 128 occupants
a. If a lesser amount is desired, please file an appeal to the building official. The appeal form is available on our website and the filing fee is $132.00. Please contact Ms. Angie Ruiz (837-4917) for processing.
b. With a total occupancy load of 128, a sprinkler system is required as per the 2012 IBC, Section 903.2.1.2. Please change the FIRE SPRINKLER statement to YES.
SHEET A0.1
2. Please recalculate the accessible seating based upon the 128 occupant load.
3. Please rework the Life Safety Info and the Exit Notes reflecting an installed sprinkler system.
SHEET A1.0
4. The dimensions are incorrect on detail 1/Floor Plan.
SHEET A1.2
5. Section A1.1 in not the correct wall section. Please provide a new wall section through the new exhaust hood showing all structural support details and back construction materials and finishes as per code.
a. Provide all structural calculations and details for the support elements.
SHEET M1.0
6. Provide structural calculations for all new top mounted HVAC equipment.
GENERAL
7. City of Tucson minimum actual lettering size is 3/32" both upper and lower case. Several sheets of this submittal do not meet this minimum standard. Please correct all non compliant sheets and resubmit.
END OF REVIEW
05/14/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum height of 3/32-inch. Reference: Section 107.2.1, IBC 2012.
2. Show that the proposed HVAC system and equipment meet the requirements of Sections C403.2 and C403.3, IECC 2012 (e.g. provide the mechanical energy code compliance certification from COMcheck based upon the 2012 IECC). Reference: Section C303.1, International Energy Conservation Code 2012.
3. Show the size of the condensate drain pipes. Note that RTU-3 is noted as having a cooling capacity of 6-tons on sheet M1.0 but only 5-tons on sheet P1.0. Reference: Sections 307.2.1, IMC 2012 as amended by the City of Tucson.
4. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. the fans shall run whenever the HVAC system supplies air to the room) with no more than 10% exhausted air being recirculated. Reference: Section 403.2.1 (4), IMC 2012.
5. The occupant load used to calculate the required ventilation is not necessarily the same as the occupant load used for calculating exiting requirements. The occupant load used for calculating the minimum required ventilation is to be based on Table 403.3, IMC 2012 or an approved engineering analysis of the specific occupancy type. Reference: Section 403.3, IMC 2012.
6. Ventilation calculations for HVAC systems supplying multiple zones (e.g. RTU-3 and RTU-5) shall take into account the different occupancy loads in each zone. Reference: Section 403.3.2.3, IMC 2012.
7. Verify that the proposed Type I hood is equipped to automatically start the hood exhaust fan when cooking operations commence. Reference: Section 507.2.1.1, IMC 2012.
8. If the proposed Type I hood is not listed for zero-clearance to combustibles, provide information regarding the construction of the demising wall adjacent to the grease hood (i.e. combustible or non-combustible construction?). Reference: Section 507.9, IMC 2012.
05/14/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the specified temperature mixing valve to comply with Section 607.1.2, IPC 2012. Watts Hot Water Temperature Control Valve Series 1170 are designed to be installed at or near the boiler or water heater. They cannot be used by themselves for tempering water temperatures at fixtures where ASSE Standard 1016 or ASSE Standard 1070 listed devices are required.
2. Section 604.1, IPC 2012 allows water distribution systems to be designed using accepted engineering methods. Sizing pipes for water distribution systems using Section 10.4, UPC 2006 is an accepted engineering method only if it is used as presented in Sections 610.6 through 610.13, UPC 2006. Section 610.10, UPC 2006 specifies that the fixture units for flushometer valves be determined with Table 6-7; a single urinal flushometer valve is given the value of 20 fixture units when using Table 6-6 to determine pipe sizes, not 4 fixture units.
3. Verify the developed length of the two branches of the hot water distribution system. If the developed length of either hot water supply branches is greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2012.
4. Horizontal drainage piping shall be installed at a minimum slope in accordance with table 704.1, IPC 2012.
5. Provide separate indirect waste pipes for each compartment of the 3-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012.
6. Verify that all of the vents located within the building rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2012.
05/14/2013 ROBERT SHERRY WATER REVIEW Denied Provide the size of both the water service meter and the reduced pressure backflow preventer assembly serving this suite. Reference: Section 107.2.1, IBC 2012.
05/21/2013 KEN BROUILLETTE FIRE REVIEW Denied WAITING FOR REVISIONS