Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM02467
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/30/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
05/02/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a design for the water heater platform and show how the proposed platform is to be connected to the building structure. Reference: Section 301.2, IPC 2012. 2. Clarify the design of the propane supply to the air handler. Provide the initial and secondary supply pressures to be used. Reference: Sections 402.4 and 402.5, IFGC 2012. 3. Verify the discharge size for the pressure relief valve for the water booster pump. Reference: Section 606.5.10, IPC 2012. |
05/06/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Clarify how the airflow from AHU-1 is to be distributed among the three major building areas (i.e. CFM/room). 2. Provide calculations to show that the ventilation system is sized in accordance with Section 403.3, IMC 2012. 3. Provide justification for the use of a Zone Air Distribution Effectiveness (Ev) of 1.0 for a ceiling supply, ceiling return system using a gas-fired heating section. Reference: Section 403.3.1.2, IMC 2012. 4. The Mechanical Compliance Certificate indicates that a credit has been taken for using MERV 9-12 filtration but the specifications call for MERV 8 filtration; adjust the filter specification or recalculate the pressure drop adjustment. Reference: Section C403.2.10 and Table C403.2.10.1 (2), IECC 2012. |
05/07/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET SP-1 1. Under the CODE REVIEW: Delete all reference to ADAAG and correct ANSI to 2009 Edition, ICC A117.1. 2. Correct Occupancy Load to 273. SHET A1.2 3. At detail 1-A, provide 3'-0" wide urinal stall. 4. At Floor Plan: a. Provide 3'-0" wide urinal stall. b. Provide a minimum 42" wide corridor access to the accessible stall. STRUCTURAL DRAWINGS 5. Provide structural calculations for: a. All structural details and framing design shown on sheets S1.1 through S3.3. b. Water heater and water pressure booster platforms. END OF REVIEW |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/07/2013 | CPIERCE1 | APPROVAL SHELF | Completed |
05/07/2013 | CPIERCE1 | REJECT SHELF | Completed |