Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T13CM02311
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/07/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | Need to total fees. |
05/07/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | The revised control specification does not comply with the requirements of Section C403.2.4.3.3, IECC 2012; the code requires the unit to automatically adjust its daily start time in order to have the building at the desired temperature in time for the start of occupancy. [Initial comment: Revise the control specifications so that each rooftop unit has a thermostatic control that provides for automatic shutdown and start-up control. Reference: Section C403.2.4, IECC 2012.] |
05/07/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Boilers are required to comply with the rules contained in Article 4 (Arizona Boilers and Lined Hot Water Heaters) of the Arizona Administrative Code. http://www.azsos.gov/public_services/Title_20/20-05.htm#ARTICLE_4 2. Comment not addressed. Provide equipment data for the water heaters, the steam generator, and the air vacuum. Reference: Section 107.2.1, IBC 2012. 3. Comment not addressed. Provide sufficient information to show that the installation of the new plumbing fixtures will not cause the existing water supply and sanitary waste systems to become locally overloaded (e.g. "Connect the new sanitary sewer to the existing sanitary sewer of equal or greater size."). Reference: Section 107.2.1, IBC 2012. 4. Comment not addressed. Show the sizes, routes, and terminations for the steam and air vacuum piping. Reference: Section 107.2.1, IBC 2012. 5. Comment not addressed. Provide a design for the mounting shelf for the water heater. Reference: Section 301.2, IPC 2012. 6. Comment not addressed. Install the proposed vacuum relief valve for the water heaters per the manufacturer's listing information, i.e. on the cold water supply to the water heater. Reference: Section 303.2, IPC 2012. 7. Comment not addressed. Provide fixture descriptions for all plumbing fixtures. Reference: Section 402, IPC 2012 and Section 107.2.1, IBC 2012. 8. Comment not addressed. Clarify the pipe sizes for the water distribution and coordinate the plumbing plans, the water isometrics, and the water heater detail (e.g. the cold water line from the water heater to the two restrooms is shown as being ½", ¾", and 1"). Reference: Section 107.2.1, IBC 2012 and Section 604.1, IPC 2012. |