Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T13CM02138
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/12/2013 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
04/15/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
04/22/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET S1.2 1. Please provide certification of special inspectors as indicated. SHEET S2.1 2. The steel pipe bridge indicates B2 to be C12 x 20.7 while calculations call for a W12 x 22. Please reconcile. 3. An over the counter correction approval is available. END OF REVIEW |
04/23/2013 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/26/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
04/26/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide the civil site plan (referenced on sheet P1.0) that shows the extension of the building sewer to the public sewer. Reference: Section 107.2.1, IBC 2012. 2. Provide a full-open valve for the water service at the equipment building entrance. Reference: Section 606.1(2), IPC 2012. 3. Show how contamination of the water distribution system due to connections to process equipment is prevented. Reference: Section 608.1, IPC 2012. 4. Clarify the installation of the two floor sinks located in the equipment room. The plumbing schedule on sheet P2.0 calls out a 1-1/2" vent and a trap primer for each floor sink but these are not shown with either fixture. Reference: Section 107.2.1, IBC 2012 and Sections 901.2.1 and 1002.4, IPC 2012. |
04/26/2013 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide the civil site plan (referenced on sheet P1.0) that shows the location of the new ¾" water meter and the existing 1" RPBP. Reference: Section 107.2.1, IBC 2012. |
04/30/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/22/2013 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
05/22/2013 | CPIERCE1 | REJECT SHELF | Completed |