Permit Number: T13CM02056
Parcel: 14108534A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM02056
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/15/2013 KEN BROUILLETTE FIRE REVIEW Approved
04/17/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A1.0; EXIT PLAN: MOVE THE EXIT ACCESS TRAVEL DISTANCES INDICATED ON THE PLAN SO THEY ARE LEGIBLE.
2. SHEET A2.0 (WALL LEGEND); SHEET A2.1 (FLOOR PLAN 1): IN THE WALL LEGEND, REFERENCE FLOOR PLAN 1 ON SHEET A2.1 FOR WALL W6 LOCATION.
3. SHEET A2.0 (WALL LEGEND); SHEET A2.1 (WALL SECTION 6): THE LEGEND INDICATES W3 AS 4" STUDS AT 24" OC, WHILE THE SECTION INDICATES 6" STUDS AT 16" OC. COORDINATE.
4. SHEET A2.0 (WALL LEGEND); SHEET A2.1 (WALL SECTION 10): THE LEGEND INDICATES W7 AS 4" WOOD STUDS AT 16" OC, WHILE THE SECTION INDICATES 2"X WOOD STUDS AT 24" OC. COORDINATE.
5. SHEET A2.1; WALL SECTION 7: THE SHORT WALL ON THE CLEAN ROOM SIDE MUST BE ABLE TO RESIST HORIZONTAL LOADS SPECIFIED IN THE IBC SECTION 1607.14. PROVIDE BRACING ON THE DRAWINGS AS REQUIRED, AND INCLUDE THE BRACING SIZE, SPACING, AND END CONNECTIONS.
6. SHEET A2.1 (KEY NOTES); WALL SECTION 9: KEY NOTE 2 INDICATES 2"X WOOD STUDS AT 24" OC, AND TO REFERENCE STRUCTURAL. WALL SECTION 9 INDICATES 6" WALL STUDS AT 16" OC. COORDINATE AND REVISE KEY NOTES AND THE SECTION.
7. SHEET A2.1; SECTIONS 4 AND 5: REFERENCE A DETAIL ON THE DRAWINGS AT THE CONNECTION OF THE GUARD RAIL TO THE FLOOR.
8. SHEET A2.2 (DETAIL 4); SHEET S4.1 (DETAILS 205 AND 206): THE ARCHITECTURAL DETAIL INDICATES TO REFERENCE STRUCTURAL AT THE GUARD RAILING, WHILE THE STRUCTURAL DETAILS INDICATE TO SEE ARCHITECTURAL. COORDINATE.
9. SHEET S2.1: REMOVE ONE OF THE SHEETS (TWO SHEETS INCLUDED IN THE SET).
10. SHEET S3.2 (FRAMING PLAN AT ADD ALT. #1); STRUCTURAL CALCULATIONS (SHEET 5): THE FRAMING PLAN INDICATES A B5 BEAM ON GRID D.1 BETWEEN GRIDS 12 AND 13, WHILE THE CALCULATIONS DO NOT SHOW THAT BEAM. CLARIFY.
11. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. SUBSEQUENT REVIEWS WILL NOT BE PERFORMED UNTIL RESPONSES ARE RECEIVED.
04/19/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM02056
6620 S Memorial Pl #100

1. Sheet M4.1 shows an AC/A unit(208v single phase) and
DS/A units, not in panel schedules.
2. Sheet P2.2, shows WH-1(50 gal ) 480v 3 phase, not in panel schedule.
3. Sheet P2.2 also shows RCP pump(115v) not in panel schedule.
Everything else ok.

Ray T Majuta
Elect Plan Review
DSD, Tucson
4/19/2013
Ray.Majuta@tucsonaz.gov
04/22/2013 ROBERT SHERRY WATER REVIEW Denied Clarify the water demand calculation; is the existing water distribution system primarily a tank system or a flush valve system? Reference: Section 107.2.1, IBC 2012.
04/22/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide information to show that the installation of the air admittance valves for the wash fountains complies with the manufacturer's listing requirements. Reference: Section 303.2, IPC 2012.
2. Show that the wash fountains will be supplied with a minimum water pressure of 20 PSI. Reference: Section 303.2, IPC 2012.
3. Verify that the "Tempcontrol" mixing valve for the wash fountains complies with ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012.
4. Provide justification for the water fixture units used for the wash fountains. Each wash fountain delivers 5 GPM when the foot control rail is pressed and requires, at a minimum, 1" cold water and 1" hot water supplies. A wash fountain is not comparable to a lavatory operating at 0.5 GPM. Reference: Section 604.1, IPC 2012.
5. Clarify how the cleanouts shown for each wash fountain in detail 3/P2.1 are accessed and have adequate clearance for snaking. Reference: Sections 708.7 and 708.8, IPC 2012.
04/23/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide the mechanical energy code compliance certification for the installation of the new mechanical equipment. Reference: Section C303.1, International Energy Conservation Code 2012.
2. Provide structural calculations and connection details to verify that the ceiling grid and mezzanine framing are capable of supporting the filter fan units. Reference: Section 302.1, IMC 2012
3. The equipment mezzanine appears to be built with a plywood deck; provide auxiliary drain pans or secondary drain systems for the fan coil units. Reference: Section 307.2.3 IMC 2012.
4. Provide calculations demonstrating adequate ventilation for all of the zones being modified using the current code. Zones that are not identified in Table 403.3 (e.g. the manufacturing areas) will require an engineering analysis of the occupancy of the area, the work being performed, and the contaminants in the air to determine the required ventilation rate. Reference: Section 403.2, IMC 2012.
5. Show how the design of the exhaust flow rate for the battery charging room complies with the requirements of Section 502.3, IMC 2012 to prevent the accumulation of flammable gases.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/26/2013 SHANAE POWELL OUT TO CUSTOMER Completed
04/26/2013 CPIERCE1 REJECT SHELF Completed