Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM01990
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/05/2013 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
04/05/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
04/05/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
04/05/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
04/05/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1.1; FLOOR PLAN (KEYNOTES): REMOVE NOTES NOT PERTINENT TO THIS PROJECT. 2. SHEET A4.1; DETAIL 4: PROVIDE THE SPACING OF THE BRACES AND THE CONNECTION OF THE BRACES TO THE TOP OF THE WALL AND TO THE ROOF STRUCTURE ABOVE. 3. SHEET A4.1; DETAIL 2: IF THIS BARRIER IS TO BE CONSTRUCTED ON THIS PROJECT, ENLARGE THE LETTERING TO A MINIMUM OF 3/32" IN HEIGHT (UPPER AND LOWER CASE LETTERS). 4. SHEET A4.2: IF NEW GRAB BARS ARE TO BE ADDED, PROVIDE A DETAIL FOR THE HORIZONTAL AND VERTICAL GRAB BARS PER ICC/ANSI FIGURE 604.5.1. 5. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
04/05/2013 | FRODRIG2 | WWM | REVIEW | Passed | |
04/05/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
04/05/2013 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
04/05/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
04/05/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |