Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM01980
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/16/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET A00.0 1. Applicable Codes: Change the accessible code to 2009 ICC A117.1. STRUCTURAL DRAWINGS 2. Provide structural calculations for the following: a. All structural design and details shown on the structural drawings. b. All new roof top mounted HVAC equipment. END OF REVIEW |
04/23/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise detail H/P03.1 so that the installation of the specified instantaneous water heater complies with the manufacturer's listing requirements. Reference: Section 303.2, IPC 2012. 2. Provide tempered water for the lavatories and public hand-washing sinks using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. 3. Provide a vacuum relief valve for bottom-fed storage-type water heaters. Reference: Section 504.2, IPC 2012. 4. Provide a device to control the pressure of the water heater storage tank caused by thermal expansion. Reference: Section 607.3.2, IPC 2012. 5. Provide a design for the mounting shelf for the water heater and show how the mounting shelf is to be supported from the building structure.. Reference: Section 301.2, IPC 2012. |
04/24/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or above grade in an area capable of absorbing the condensate flow without surface drainage (see keynote #4, P02.1). Reference: Section 307.2.1, IMC 2012, as amended by the City of Tucson. 2. Provide calculations to show that the ventilation system is sized in accordance with Section 403.3, IMC 2012. 3. Show that the proposed HVAC system and equipment meets the requirements of Sections C403.2 and C403.3, IECC 2012 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. |
04/29/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/21/2013 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
05/21/2013 | CPIERCE1 | REJECT SHELF | Completed |