Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T13CM01840
Parcel: 12709008A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM01840
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/09/2013 MARTIN BROWN FIRE REVIEW Approved
04/12/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
04/12/2013 ROBERT SHERRY WATER REVIEW Approved
04/12/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide a cleanout for the horizontal drain serving the sink and floor sink located in the repair room; the cleanout shall be sized per Section 708.7, IPC 2012 (the removable trap of the sink is 1-1/2" and the horizontal drain is 3"). Reference: Section 708.3.1, IPC 2012.
2. Clarify how the installation of a p-trap at the outlet of the gold trap is not double trapping. Reference: Sections 1002.1 and 1003.5, IPC 2012.
04/16/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide natural gas pipe sizing calculations. Include gas pressures and the developed pipe lengths from the gas meter to each load point on the plans. Reference: Section 402.3, IFGC 2012.
2. Show the continuation of the natural gas piping from the repair room on the roof plan. Reference: Section 107.2.1, IBC 2012.
3. Provide the amount (SCF) of oxygen being stored and in-use. Reference: Section 107.2.1, IBC 2012.
4. Show how the oxygen-fuel gas system complies with the requirements of NFPA 51 with regard to valves, flashback arrestors, and labeling. Reference: Section 107.2.1, IBC 2012.
5. Provide the listing data for the natural gas booster pump and the pressure settings. Reference: Section 107.2.1, IBC 2012.
6. Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or above grade in an area capable of absorbing the condensate flow without surface drainage. Verify that the roof drains that are receiving the condensate from the rooftop units terminate in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2012, as amended by the City of Tucson.
7. Provide calculations demonstrating that adequate ventilation is being provided, including the areas served by the variable volume control terminals. Reference: Section 403.2, IMC 2012.
04/23/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM01840
5955 E Broadway

1. Show locations of the service and panels on the
electrical sheets. Do not see them on any of the electrical
sheets, other than the one line diagram Sheet E-4.
2.Clearify the the following equipment and show them together in one room on the same sheet;
Supervisory Panel
Security Panel
EMS Panel
Contactor Panel.
3. Cannot locate circuits LBA-1, L 13,15 on the plans.

Ray T Majuta
Elect Plan Review
DSD, Tucson
4/23/2013
Ray.Majuta@tucsonaz.gov