Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T13CM01837
Parcel: 11904600F

Address:
3781 S 12TH AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM01837
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/09/2013 MARTIN BROWN FIRE REVIEW Approved
05/13/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied GENERAL
1. Several sheets through out this submittal have lettering sizes that are not compliant with City of Tucson minimum actual letting size of 3/32" in height, actual, upper and lower case. Please confirm each non compliant sheet, revise the size of the letters and resubmit.
SHEET A0.0
2. Under Code Data, delete all ADAAG references and insert 2009 Edition, ICC A117.1.
3. Add the correct occupancy load total, 407, to the Occupancy Load summary as calculated on sheet A0.2.
4. Please show code analysis for "Unlimited" building area allowed.
5. Please clarify why there are two buiilding area analysis in the Code Data summary, Sections B and D?
a. Which one is correct?
6. Rework your plumbing fixture calculations based upon the calculated occupancy load of 507 and required number of fixtures from table 2902.1 of the 2012 IBC.
SHEET A.01
7. At detail 7, delete the signage requirement shown mounted in the middle of the door and correct your signage specifications to that as pet the 2009 ICC A117.1, Section 703.
8. Insure that all details shown on this sheet are as per the 2012 IBC, Chaspter 11 and 2009 Edition, ICC A117.1.
SHEET A0.2
9. The exit separation if sprinkled, is 1/3 of the diagional distance not 1/2. That's under a non-sprinkled building.
SHEET S1.0
10. Please provide Certification of Special Inspectors.
STRUCTURAL SHEETS
11. Please provide structural calculations for all the details shown on the structural drawings that are not covered in the submitted calculations for roof top mechanical equipment.
END OF REVIEW
05/15/2013 RMYERS1 WATER REVIEW Approved
05/15/2013 RICK MYERS PLUMBING-COMMERCIAL REVIEW Denied 1. See sheet P3.0 Plumbing Keyed Notes #3- Thermostatic mixing valve under lavatory... refer to detail on sheet P2. Please provide Sheet P2. 2. See sheet P30 Plumbing Keyed Notes #14 water heater. Refer to A4.0 detail. Show how the structure is to support the weight of the platform and the water heater. Provide water heater plumbing details mentioned in keynote #14. Water heaters located above the fixture outlet level to be equipped with vacuum relief.
05/15/2013 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved
05/15/2013 LEERAY HANLY MECHANICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/24/2013 FERNE RODRIGUEZ OUT TO CUSTOMER Completed
05/24/2013 CPIERCE1 REJECT SHELF Completed