Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM01786
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/19/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
04/29/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1.1; WALL SYMBOLS: PROVIDE A DETAIL OR NOTE ON THE PLANS FOR THE BRACING REQUIRED BY THE IBC SECTION 1607.14 TO RESIST A 5 PSF HORIZONTAL LOAD (FOR INTERIOR WALLS THAT DO NOT EXTEND TO THE STRUCTURE ABOVE). INCLUDE THE BRACING SIZE, SPACING, CONNECTION TO THE TOP OF THE WALL (SIZE AND QUANTITY), AND CONNECTION TO THE STRUCTURE ABOVE (SIZE AND QUANTITY). 2. SHEET A1.1; ROOM FINISH SCHEDULE (CEILING MATERIAL): NOTE 1 REFERENCES DETAIL 14/A5.1-1 FOR THE CHAIR RAIL. REVISE THE REFERENCE. 3. SHEET A4.1; KEYED NOTE 10: ARE ALL GRAB BARS EXISTING? VERIFY (IF NOT, LOCATE ON ELEVATIONS). 4. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. NO FURTHER REVIEWS WILL BE PERFORMED UNTIL RESPONSES ARE RECEIVED. |
05/01/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
05/01/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show the proposed work on the mechanical plan, sheet M1.1. Reference: Section 107.2.1, IBC 2012. 2. Show the size, routing, and termination of the condensate drain for the new indoor unit, AHU1. Reference: Sections 307.2.1, IMC 2012 as amended by the City of Tucson. 3. Show that the proposed HVAC system and equipment meets the requirements of Sections C403.2 and C403.3, IECC 2012. Reference: Section C303.1, International Energy Conservation Code 2012. |
05/02/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Verify that the mixing valve specified for fixture PLC-2B is listed as conforming to ASSE 1070. Reference: Sections 416.4 and 607.1.2, IPC 2012. 2. Revise the drains for the new 3-compartment sink (detail PSD-7/P65.1) to be independently routed to the indirect waste receptor and terminated with an air gap. Reference: Sections 801.2 and 802.1, IPC 2012. 3. Clarify the use of a reduced pressure zone principle backflow preventer downstream of a double check valve for the ice maker, detail C, P1.1. Reference: Section 107.2.1, IBC 2012. 4. Revise the vents for the combination waste and vent systems near columns C-2.5 and C-4. All vents located within a building shall rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Sections 905.4 and 915.2.2, IPC 2012. |
05/09/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |