Permit Number: T13CM01588
Parcel: 10512020C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM01588
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/20/2013 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Office Depot
T13CM01588
Building Plan (1st Review)

TRANSMITTAL DATE: March 20, 2013


1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. There is a new concrete ramp shown along the north side of the building. It appears that the ramp is located within the right-of-way. A temporary revolkable easement is required. Provide a copy of the approved easement with your next submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
03/20/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Show the size, routing, and termination of the condensate drains. Reference: Sections 307.2.1, IMC 2012 as amended by the City of Tucson.
2. Coordinate the exhaust fan schedule (note #2) with the sequence of operation for the restroom exhaust fans as shown on sheet M301. Reference: Section 403.2.1 (4), IMC 2012.
03/20/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Provide calculations showing how the water supply piping has been sized. Reference: Sections 604.1 and 604.3, IPC 2012.
03/20/2013 ROBERT SHERRY WATER REVIEW Denied Provide the size of both the water service meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2012.
03/20/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A001; BUILDING CRITERIA: REMOVE THE REFERENCE TO THE 2010 ADAAG, AND ADD THE 2009 TO THE ICC/ANSI.
2. SHEET A001; DEMOLITION PLAN: ADD DIMENSIONS AND ELEVATIONS TO THIS PLAN AS INDICATED.
3. SHEETS A001, A100, A102, A103, A111, A201, A202, A402, A403, A404, AND A501: REMOVE THE NOTE IN THE TITLE BLOCK 'PLAN CHECK SET ONLY NOT FOR BID'.
4. SHEET A102; PARTITION TYPE P2: IS THIS WALL TYPE SHOWN ON THE PLAN? VERIFY.
5. SHEET S1; GENERAL CONSTRUCTION NOTES: REMOVE THE REFERENCE TO THE 2011 L.A. CITY BUILDING CODE.
6. SHEET A102 (DETAIL 8); SHEET S1 (DETAIL 1): COORDINATE THE DETAILS ON THESE SHEETS.
7. SHEET S2: DARKEN THE DIMENSIONS.
8. SHEET S2: IS THIS FOUNDATION PLAN REQUIRED FOR THIS PROJECT? IS THIS THE CORRECT JOB?
9. SHEETS S1 THROUGH S4: DRAWINGS MUST BE STAMPED BY A PROFESSIONAL LICENSED IN THE STATE OF ARIZONA.
10. GENERAL STRUCTURAL: ARE THESE PLANS ALL PERTINENT TO THIS PROJECT? VERIFY.
11. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. NO SUBSEQUENT REVIEWS WILL BE DONE WITHOUT RESPONSES.
03/20/2013 LAITH ALSHAMI ENGINEERING REVIEW Approved
03/20/2013 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
03/26/2013 CPIERCE1 WWM REVIEW Needs Review
03/26/2013 CPIERCE1 ELECTRICAL-COMMERCIAL REVIEW Completed
03/26/2013 CPIERCE1 FIRE REVIEW Needs Review