Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T13CM01491
Parcel: 117042630

Address:
222 E 5TH ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM01491
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/03/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied SHEET A3.0
1. Provide stair section and structural details for the new 4 riser set of stairs.
a. Provide handrail elevation with all code required dimensions.
2. At stairwell 1 and referenced by note 6, provide all handrail extensions as per sections 1 and 2/A7.1.
3. Provide structural details and calculations for the wall mounted water heater.
SHEET A3.1
4. Provide drinking fountains as required by the 2012 IBC, section 1109.5 and the 2009 ICC A117.1, Section 602.
5. Provide service sink as required by the 2012 IBC, Table 2901.1.
6. Verify that that door 100a is compliant with the 2012 IBC, Section 1005.7.
7. Provide toilet plan reference to the large scale toilet plan detail 1/A5.1.
SHEET A3.2
8. Refer to comment 2 for same non-compliant issue at stair 1.
SHEET A/3.3
9. Provide additional men and women toilets as required by the 1012 IBC, Section 2902.3.2.
SHEET A3.4
10. Provide structural calculations for all new roof top mounted HVAC equipment.
SHEET A/5.1
11. At detail 1: Provide and show all accessible requirements including but not limited to all dimensions, clearances, accessories, fixtures, signage, finishes and toilet elevation references.
12. Provide all toilet elevation elevations showing all accessible requirements including but not limited to all dimensions, clearances, accessories, fixtures, signage, finishes.
SHEET A6.1
13. The dock height at section reference 30/A9.1 scales 2'-0" high while at detail 10/A1.1, the grade differential is close to 1'-0". Please reconcile.
SHEET A7.1
14. Provide handrail extension dimensions.
SHEET A/9.2
15. At detail 50, please reconcile suspension bracket support with what is shown at detail 1/M9.2.
SHEET S1.6
16. Please provide certification of all special inspectores required as per the 2012 IBC, Section 1704. Please review the special inspections listed in the conditions menu of this application and confirm selection or add or delete those inspections required and coordinate with plan reviewer.
END OF REVIEW
04/09/2013 KEN BROUILLETTE FIRE REVIEW Denied PLEASE UPDATE SHEET a0.1, a0.2, a0.3 and a0.4 with current standards as listed in the 2012 IFC.
Look at IFC Section 905 and include Standpipes in design.
04/09/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM01491

1. Sheet E4.0, the owner (his contractor) is required to provide the condutors in the service riser. Size the conductors, show type insulation (will be required to be sun light resistant), size conduit.
2. Sheet E4.0, size conductors and conduit between CT enclosure and gutter.
3. Sheet E4.0, the # 3 GRD's in the feeders between the gutter and the three main disconnects is required to be # 2
per 2011 250.102.

Ray T Majuta
Elect Plan Review
DSD, Tucson
4/11/2013
Ray.Majuta@tucsonaz.gov
04/16/2013 ROBERT SHERRY WATER REVIEW Denied Provide a reference site plan that shows the location and size of the water meter and the reduced pressure backflow preventer assembly.
04/16/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide tempered water for the lavatories using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012.
2. Provide a reference site plan that shows the route, slope, cleanouts, and termination of the building sewer. Reference: Section 107.2.1, IBC 2012.
3. The rim elevation of the next upstream sanitary manhole appears to be much higher than the basement floor elevation (the first floor elevation may also be less than 12" above the next upstream manhole). Provide a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson.
4. Clarify the design and dimensions for the scuppers and downspouts for the elevator tower (see sheet a3.4). Reference: Sections 1106 and 1108, IPC 2012.
5. Architectural sheet a3.4 shows a roof drain and overflow drain located approximately at column e-2.5 but these drains are not shown on the plumbing sheets; coordinate with the architectural drawings. Reference: Section 107.2.1, IBC 2012.
04/16/2013 JASON GREEN ENGINEERING REVIEW Needs Review
04/17/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide energy code compliance calculations for the additions to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012.
2. Provide auxiliary drain pans or secondary drain systems for fan coil units. Reference: Section 307.2.3 IMC 2012.
3. Provide calculations demonstrating adequate ventilation using the current code. Include the entire warehouse area in the calculations; it is not sufficient to ventilate only the corridors. Reference: Section 403.2, IMC 2012.
4. Provide information on the sequence of operation for the restroom exhaust fans to show that all of the air supplied to the restrooms will be exhausted with no more than 10% exhausted air being recirculated. (Note: the minimum exhaust rate for the men's restroom is 100 CFM due to the water closet and the urinal.) not Reference: Section 403.2.1 (4), IMC 2012.
5. Provide ventilation for the elevator shaft. Reference: Section 403.3, IMC 2012.
6. Clarify the refrigeration notes on sheet M1.5: "REFRIGERANT PIPING DN THRU ROOF TO RESPECTIVE FCU'S. SEE M1.4 FOR COMPUTER". What computer?
04/26/2013 TERRY STEVENS ZONING REVIEW Denied Zoning cannot approve the building plan until the Development Package has been approved.