Review Date Reviewer's Name Type of Review Description Status Comments
03/18/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied SHEET CS
1. The code index is not correct. Please revise to the most current City of Tucson adopted code versions as shown on our web site.
2. Up date your drawing index. Please add sheets M3.01 and DMPE1.
CODE ANALYSIS DATA SHEET (8 1/2 X 11 Insert)
3. Please provide updated code adoptions.
4. Please finish the Summary and Calculations sections.
SHEET A1.0
5. Detail 3 is not acceptable. It will not provide the partition lateral load as per the 2012 IBC, Section 1607.14. Use detail 2.
6. Genaral Notes Number 5: All new partitions are to be braced to the structure above to maintain a lateral load of 5 psf as per Section 1607.14. Please revise note 5.
SHEETS P2.01 AND P3.01
7. The water heater details shown on the two sheets are in conflict. Please select either a floor mounted unit or a wall mounted unit and revise the details accordingly.
a. If a wall mounted version is selected, please provide structural details and calculations.
SHEET M101
8. Please provide structural calculations for all new roof top mounted HVAC equipment.
END OF REVIEW
03/21/2013 KEN BROUILLETTE FIRE REVIEW Approved
03/25/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM01340

1. Change cover sheet to reflect 2011 NEC under
Code Index.
2. Provide fault current calculations begining at Landlord
SES to and including Panels HA,LA and LB, per NEC 110.09, 110.22 and indicate values equipment is to be rated for.
3. Sheet E1.02, circuit for receptacle on roof (HA-13) is in the 277/480v panel, should be in LA or LB.
4. Sheet E1.01, LA-35 is for receptacle, shows to EX FN in panel schedule.
5. Sheet E3.02, support for 75 kva transformer, verify using 1/4" allthread is sufficient for weight.
6. The 75 kva transformer is to comply with 450.13 (B) for spaces allowed correct ?
7. Per Mechanical Plan Review, supply air provided into restrooms to be exhausted at same time, electrical configuration now will not allow.

Ray Majuta
Elect Plan Review
DSD, Tucson
3/26/2013
Ray.Majuta@tucsonaz.gov
03/26/2013 ROBERT SHERRY WATER REVIEW Approved
03/26/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that a notation shall be placed beneath the seal, either written, typed, or electronically generated, that provides the day, month, and year of the expiration of current registration. (Effective March 8, 2008).
2. Clarify the plumbing code to be used for this activity. The plumbing general notes on sheet PME1.01 refers to the 2012 IPC but the Code Index on sheet CS refers to the 2003 IPC. This review has been made using the 2012 IPC.
3. Clarify the meaning of "CW": it appears to mean "condensate waste" on sheet P1.01 and "cold water" on sheet P2.01. Reference: Section 107.2.1, IBC 2012.
4. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2012.
5. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Section 301.2, IPC 2012.
6. Clarify that the specified thermostatic mixing valves or faucets for the lavatories shall conform to ASSE 1070. Reference: Section 416.5, IPC 2012.
7. Provide water pressure and water pipe sizing calculations. Note that the specified water closet requires a minimum flow pressure of 35 PSI. Reference: Sections 604.1 and 604.3, IPC 2012.
8. The developed length of the hot water supply piping appears to be greater than fifty feet. Provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2012.
9. Clarify how the condensate drains from the wall-mounted A/C units are terminated (keynote 8). Equipment discharging non-potable clear-water waste (e.g. condensate from cooling coils) to the building drainage system shall discharge to an indirect waste receptor via an air gap or an air break. Reference: Section 802.1.5, IPC 2012.
10. Provide a complete diagram of the natural gas distribution system showing the meter location, all of the loads, pipe sizes, developed lengths, and the layout of the distribution piping. Reference: Section 107.2.1, IBC 2012.
03/26/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that a notation shall be placed beneath the seal, either written, typed, or electronically generated, that provides the day, month, and year of the expiration of current registration. (Effective March 8, 2008).
2. Clarify the mechanical code to be used for this activity. The mechanical general notes on sheet PME1.01 refers to the 2003 IMC but the Code Index on sheet CS refers to the 2003 IMC. This review has been made using the 2012 IMC.
3. The controlling energy code is the 2012 IECC (see note #11 in the rooftop "heat pump" unit schedule).
4. Provide the mechanical energy code compliance certification for the installation of the new mechanical equipment. Reference: Section C303.1, International Energy Conservation Code 2012.
5. Revise the sequence of operation for the restroom exhaust fan, EF-1 so that all of the air supplied to the restrooms will be exhausted with no more than 10% exhausted air being recirculated (i.e. the exhaust fan shall run whenever the HVAC system is supplying air to the restroom). Reference: Section 403.2.1 (4), IMC 2012.