Permit Number: T13CM01337
Parcel: 13313006N

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T13CM01337
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/11/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A5.0; SECTION 1: AN ENLARGED DETAIL 1/2 IS INDICATED. CLARIFY.
2. SHEET A5.0; SECTION 3: PROVIDE THE REFERENCE FOR THE ENLARGED DETAIL AT THE LOWER FASCIA.
3. SHEET A5.0; SECTION 4: PROVIDE THE REFERENCE FOR THE ENLARGED DETAIL AT THE CMU CAP.
4. SHEET A5.1; SECTION 2: PROVIDE THE REFERENCE FOR THE ENLARGED DETAIL AT THE LOWER FASCIA.
5. SHEET S1.0 (FOUNDATION PLAN); STRUCTURAL CALCULATIONS: NO CALCULATIONS WERE FOUND FOR THE F-2 FOOTING. VERIFY.
6. SHEET S3.0; DETAIL 3: PROVIDE A NOTE FOR THE NEW 2X BLOCKING OVER THE EXISTING W12 STEEL BEAM. INCLUDE THE SIZE AND CONNECTION TO THE EXISTING TOP PLATE, OR PROVIDE A DETAIL REFERENCE.
7. SHEET S3.0; DETAIL 3: PROVIDE A NOTE FOR THE NEW 2X WALL PLATE. INCLUDE THE CONNECTON TO THE EXISTING TRUSSES/BLOCKING, OR PROVIDE A DETAIL REFERENCE.
8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. THE REVISED PROJECT WILL NOT BE REVIEWED WITHOUT THOSE RESPONSES.
03/11/2013 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
03/11/2013 KEN BROUILLETTE FIRE REVIEW Approved
03/14/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM01337

1. The fixture schedule indicates A1, A1e and B1 to be 208 volt, panel H shows them on individual 20 amp circuits, same with the lighting contactor panel.

Ray T Majuta
Elect Plan Review
3/14/2013
03/14/2013 LOREN MAKUS ENGINEERING REVIEW Approved
03/14/2013 STEVE SHIELDS ZONING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
04/03/2013 FERNE RODRIGUEZ OUT TO CUSTOMER Completed