Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 2ND
Permit Number - T13CM01265
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/16/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
10/17/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/28/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | The piping materials specified for underground water service use within five-feet of the building (Type K copper) and for the water distribution within the building (Type L copper) will have water velocities in excess of 8.0 FPS with a flow rate of 120 GPM. Verify that the projected water demand will not result in water velocities greater than that recommended by the pipe manufacturer (e.g. limit the water velocity to less than 8 FPS for copper, PEX, or CPVC piping) or revise the pipe sizes. Reference: Table 604.3, IPC 2012. |
11/08/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/18/2013 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
11/18/2013 | CPIERCE1 | REJECT SHELF | Completed |