Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM01164
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/04/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
| 03/11/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET T1; DEVELOPMENT DATA: IT IS NOT CLEAR AS TO WHAT THE EXPANSION AREA CALCULATIONS REPRESENT. WHAT IS THE ORIGINAL BUILDING AREA (40,358 SF ENCLOSED + 3840 SF COVERED)? WHAT IS THE EXISTING BUILDING AREA (40,881 SF ENCLOSED + 3317 SF COVERED)? HOW DO THESE NUMBERS RELATE TO THIS PROJECT? IT LOOKS AS IF THE NEW BUILDING AREA REFERENCES EXISTING BUILDING 1. VERIFY. 2. SHEET T1; DEVELOPMENT DATA: IS THE DATA FOR THE NEW BUILDING AREA THE ONLY ONE PERTINENT TO THIS PROJECT? VERIFY. 3. SHEET T1; DEVELOPMENT DATA: REFERENCE IS MADE TO THE IBC SECTION 302.3.2 FOR ALLOWABLE AREAS FOR NONSEPARATED OCCUPANCIES. REVISE THAT REFERENCE TO THE 2012 IBC SECTION. 4. SHEET T1; BUILDING ACCESSIBILITY: REFERENCE IS MADE TO THE ICC/ANSI A117.1-2003. REVISE THIS REFERENCE TO THE 2009 EDITION. 5. SHEET A0.1; DEMOLITION FLOOR PLAN: MOVE SECTION CUT 2/A0.4 SO IT IS LEGIBLE. 6. SHEET A0.1; DEMOLITION KEYNOTES: ADD A NOTE THAT ALL KEYNOTES LISTED MAY NOT OCCUR ON THIS SHEET, AND REFERENCE SHEETS A0.2, A0.3, AND A0.4. 7. SHEET A0.2; DEMOLITION KEYNOTES: ADD A NOTE THAT ALL KEYNOTES LISTED MAY NOT OCCUR ON THIS SHEET, AND REFERENCE SHEETS A0.1, A0.3, AND A0.4. 8. SHEET A0.3; DEMOLITION KEYNOTES: ADD A NOTE THAT ALL KEYNOTES LISTED MAY NOT OCCUR ON THIS SHEET, AND REFERENCE SHEETS A0.1, A0.2, AND A0.4. 9. SHEET A0.4; DEMOLITION KEYNOTES: ADD A NOTE THAT ALL KEYNOTES LISTED MAY NOT OCCUR ON THIS SHEET, AND REFERENCE SHEETS A0.1, A0.2, AND A0.3. 10. SHEET A2.0 (FLOOR PLAN); SHEET A3.3 (SECTION 3): THERE ARE TWO SECTION CUTS (3/A3.3) AT THE SOUTHWEST CANOPY. THE SECTION CUT ON GRID 4 SHOULD BE DESIGNATED AS SIMILAR TO SECTION 3/A3.3, OR MODIFIED. VERIFY. 11. SHEET S2.1; FRAMING KEYNOTES: NOTE 3 INDICATES AN ENTRY STRUCTURE BY OTHERS. IS THIS TO BE A DEFERRED SUBMITTAL ON THIS PROJECT, OR WILL IT REQUIRE A SEPARATE PERMIT? 12. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. SUBSEQUENT REVIEWS WILL NOT BE PERFORMED WITHOUT RESPONSES. |
| 03/19/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide calculations demonstrating adequate ventilation using the current code. Reference: Section 403.2, IMC 2012. |
| 03/19/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify the occurrence of detail 5/A5.2; is it called out as 5/A3.2 in roof plan 1 on sheet A5.2? 2. Verify that the specified tankless water heater will comply with the requirements of Sections 416.5, 607.1.1, and 607.1.2, IPC 2012, and Section 404.3, IEEC 2012. Note that the specified water heater will not turn on unless the water flow exceeds 0.69 GPM and that it only limits the leaving temperature to less than 130 degrees Fahrenheit. 3. Coordinate the water isometric (2/P2) with the plumbing fixture schedule; the isometric shows no cold water being delivered to the lavatory. Reference: Section 107.2.1, IBC 2012. |
| 03/19/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 03/19/2013 | DAVID RIVERA | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: David Rivera Principal Planner PROJECT: T13CM01164 Royal Buick -GMC - Cadillac Building Modifications TRANSMITTAL DATE: March 19, 2013 COMMENTS: 1. Zoning has reviewed the building plans and while the plans are in compliance with the approved development package, zoning cannot approve the plans until the building plans reviewers have approved and stamped the building plans. This is due to possible changes that may affect the site approval. However, zoning can review and approve the building plans over the counter once the building plans reviewers have approved and stamped the building plans. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised plans as required due to review comments |
| 03/20/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/18/2013 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
| 11/18/2013 | CPIERCE1 | REJECT SHELF | Completed |