Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM01106
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/26/2013 | TERRY STEVENS | ZONING | REVIEW | Approved | |
02/26/2013 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
02/26/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
02/26/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A0.0; CODE INFORMATION: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32' IN HEIGHT. REVISE. 2. SHEET B1.0: DARKEN THE LINE QUALITY ON THIS SHEET. 3. SHEET A6.0 (DETAIL 1); SHEET S1.0 (DETAIL 2): REVISE THESE DETAILS SO THAT THEY ARE IN AGREEMENT WITH EACH OTHER (BRACE SIZE, SPACING, AND CONNECTIONS). 4. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
02/26/2013 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
02/27/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted with no more than 10% exhausted air being recirculated. Reference: Section 403.2.1 (4), IMC 2012. |
02/27/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Water heaters with inputs of 200,000 BTUH or greater are classified as boilers and require approval from the Arizona Boiler inspector. Reference: Title 20, Chapter 5, Article 4, Arizona Administrative Code. 2. Provide gas pipe sizing calculations demonstrating conformance to Section 402.1 and 402.3, IFGC 2012. 3. Verify that the floor cleanout located under the carbonator is accessible and has adequate clearance for snaking. Reference: Sections 708.7 and 708.8, IPC 2012. 4. Verify the location of the proposed indirect waste receptor is visible for inspection and has ready access for cleaning. Reference: Section 802.3, IPC 2012. 5. Terminate the discharge of the sump pump with a direct connection to the sanitary building drain per Section 712.3.5, IPC 2012. |
02/27/2013 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Provide the size of the water meter and its total connected demand. 2. Provide location and size of the reduced pressure principle backflow protector associated with the water meter. |
02/27/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/27/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
04/09/2013 | CPIERCE1 | WWM | REVIEW | Needs Review |