Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T13CM00979
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/01/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/04/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 03/08/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 03/18/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 03/19/2013 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 03/21/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show that the solar reflectance and the thermal resistance of the roof comply with the requirements of Section C402.2.1.1, IECC 2012. 2. Verify that all of the COMcheck calculations are based on the 2012 IECC. Reference: Section 107.2.1, IBC 2012. 3. Coordinate the wall sections shown on the drawings with the component description included with the COMcheck envelope compliance certificate (e.g. the wall section shows a 6" tilt-up concrete wall with no furring or continuous insulation but the COMcheck calls for additional R-21 continuous insulation and R-0.5 cavity insulation). Reference: Section 107.2.1, IBC 2012. 4. Coordinate the number and types of doors shown on the drawings with the component descriptions and areas included with the COMcheck envelope compliance certificate. Show the U-factors and SHGC values on the door schedule. Reference: Section 107.2.1, IBC 2012. 5. Coordinate the areas, U-factors and SHGC values for the windows shown on the drawings with the component descriptions and areas included with the COMcheck envelope compliance certificate. Reference: Section 107.2.1, IBC 2012. 6. Show the U-factors and SHGC values for the skylights on the drawings and coordinate them with the COMcheck envelope compliance certificate. Reference: Section 107.2.1, IBC 2012. 7. Provide the COMcheck mechanical compliance certificate with a minimum lettering size of 3/32" if on the drawing or on 8.5"x 11" paper. Reference: Section 107.2.1, IBC 2012. 8. Coordinate the mechanical systems with the scheduled equipment (e.g. the 5-ton units are scheduled as having air economizers but do not have economizers on the COMcheck mechanical compliance certificate). Reference: Section 107.2.1, IBC 2012. |
| 03/21/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 03/22/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide roof drainage and hydraulic scupper size calculations based on the 100-year hourly rainfall rate for Tucson, 3" per hour. Reference: Sections 1106.1, 1106.4, and 1108.3, IPC 2012. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/09/2013 | CPIERCE1 | OUT TO CUSTOMER | Completed |